R E V E R B S T E A L T H R E A S S E M B L Y
1
Clamp the post head into a vise with soft jaws. Apply a liberal
amount of SRAM Butter to the top cap seals and bushing. Slide the
top cap onto the upper post with the wiper seal facing
the post head.
2
Install the IFP tube with cross holes facing up into the upper post.
Push down firmly on the IFP tube until it snaps securely into the
upper post. Ensure the IFP tube is secured and centered. The IFP
tube should be below the top of the upper post when installed
correctly.
3
Apply a thin layer of SRAM Butter to the IFP internal and external
glide rings and o-rings. Use the Reverb IFP Height Tool to press the
IFP into the upper post to the "Stealth All" line on the IFP height
tool (a depth of 30 mm). The orientation of the IFP is not critical.
4
Pour Reverb fluid into the IFP tube until the fluid overflows into the
upper post and is level with the top of the upper post. Use your
finger to remove any bubbles from the surface of the Reverb fluid.
21
REVERB STEALTH REASSEMBLY