3.2 POSITIONING OF THE APPLIANCE
Lifting the appliance and placing it in position
The appliance must be moved on site keeping it in the same packing conditions in which it
leaves the factory.
Packaging must be removed only upon final installation.
If the appliance has to be lifted, connect braces to the openings provided on the base bar,
and use suspension and spacer bars to prevent these braces from damaging the panels
during moving operations (see Figure 6).
the lifting crane and all accessory devices (braces, cables, bars) must be suitable
sized for the load to be lifted. For the weight of the appliance, consult Table 4, page
10.
The manufacturer cannot be held responsible for any damage arising during
the set-up stage of the appliance.
Figure 6
- Moving the appliance - example
The appliance can be installed at ground level, on a terrace or on a roof (if compatible with
its dimensions and weight).
The dimensions and weight of the appliance are given in Table 4, page 10.
MOUNTING BASE
Always place the appliance on a flat, levelled surface made from fireproof material and
that is able to sustain the weight of the appliance itself.
In addition, provide a small “containing” step that will prevent water from spreading during
possible winter defrosting phases.
RIGHT SIDE VIEW
FRONT VIEW
Summary of Contents for GAHP Line AR Series
Page 6: ...GAHP AR Installation start up use and maintenance manual 2 Edition 2014 08 ...
Page 30: ...GAHP AR Installation start up use and maintenance manual 26 Edition 2014 08 ...
Page 52: ...GAHP AR Installation start up use and maintenance manual 48 Edition 2014 08 ...
Page 61: ...Electrical installer section Ed 2014 08 57 Figure 22 Internal electrical wiring diagram ...
Page 82: ...GAHP AR Installation start up use and maintenance manual 78 Edition 2014 08 ...