GAHP-AR – Installation, start-up, use and maintenance manual
68
Edition:
2014-08
5.1 PROCEDURE FOR FIRST START-UP
The entire procedure for the first activation of the appliance must only be carried
out by an authorised Robur Technical Assistance Centre (TAC).
The product's guarantee may be void if the procedure is not carried out by a Robur
TAC.
Efficient operation and overall lifetime of the appliance depend on its correct use, i.e.:
•
correct
installation;
•
correct
use.
On leaving the factory, the appliance is reliable and tested.
In order to correctly execute the whole procedure for the first start-up of the appliance, it is
necessary to perform the following operations in the order shown below:
- initial verification of plant compliance;
- regulation of gas flow to the burners and switching on of the appliance;
- regulation of the plant operating parameters according to the user's requirements.
Preliminary verification of plant compliance
The Robur TAC technician must:
¾
check that the whole plant has been set up in accordance with its design,
following the instructions supplied by the manufacturer and respecting current
legislation.
(The project must have been drawn up by a qualified self-employed professional
person);
¾
check personally that all of the connections (hydraulic/gas and electrical) of the
appliance (and of the Direct Digital Controller, if connected to the appliance) have
been made correctly;
¾
check that the necessary conditions for plant compliance effectively exist (as per
the declaration consigned to the user by the qualified firm that has carried out
installation of the appliance).
The Declaration of Compliance CERTIFIES that the plant conforms to current
regulations.
This declaration is a
compulsory
document, and as such must be issued by law to
the owner by the qualified firm that has overseen the installation of the appliance.
¾
check that the water pressure and flow in the hydraulic circuit and the static gas
supply network pressure are correct, as indicated by the manufacturer.
If all the conditions listed above exist, the TAC can proceed with the operations,
performing the "first activation" of the appliance.
If any non-compliant elements arise during the first verification, the TAC may choose not
to proceed with the operation of "first activation".
Summary of Contents for GAHP Line AR Series
Page 6: ...GAHP AR Installation start up use and maintenance manual 2 Edition 2014 08 ...
Page 30: ...GAHP AR Installation start up use and maintenance manual 26 Edition 2014 08 ...
Page 52: ...GAHP AR Installation start up use and maintenance manual 48 Edition 2014 08 ...
Page 61: ...Electrical installer section Ed 2014 08 57 Figure 22 Internal electrical wiring diagram ...
Page 82: ...GAHP AR Installation start up use and maintenance manual 78 Edition 2014 08 ...