SECTION 6: H
EATER
I
NSTALLATION
23
Step 6.4 Coupling and Tube Assembly
Step 6.4.1 Coupling and Tube Assembly (Continued)
A
Close coupling and slide
opposite end into tab.
Position tab underneath
guide rail.
B
Insert wide end of slide bar/coupling lock into
guide rail on opposite end of tabs. Slide the slide
bar/coupling lock up the guide rail until snug
(approximately 3" (8 cm) to 4" (10 cm)).
C
Insert tubes into coupling
until end of each tube rests
against internal pins.
D
Description
Part Number
Coupling
01329600
Slide Bar/Coupling Lock
01329700
Tube
91409XXX
NOTE:
Prior to coupling installation review Swirler Installation on Page 25, Step 6.6. Models HEV-125 and HEV-
175 require swirler tab to be installed under coupling. Swirler installation for these models must be complete prior
to coupling installation.
• Repeat Step 6.4 A - D until all tubes are assembled.
.
Tighten slide bar as shown below.
Summary of Contents for VANTAGE HEV-100
Page 2: ......
Page 4: ......
Page 25: ...SECTION 6 HEATER INSTALLATION 21 FIGURE 20 Linear Heater Layout Overview Continued ...
Page 41: ...SECTION 7 OPTIONAL HEATER ACCESSORIES 37 FIGURE 30 U Tube Heater Layout Overview Continued ...
Page 72: ...HEV SERIES INSTALLATION OPERATION AND SERVICE MANUAL 68 ...
Page 73: ...SECTION12 TROUBLESHOOTING 69 12 2 Manifold Gas Pressure Setting Side View of Heater ...
Page 78: ......
Page 79: ...2020 ...
Page 80: ......