C
HAPTER
4
O
PERATION AND
U
SE
P
AGE
37
4.5
Start up in 5 steps
Make sure that the analyser was installed in accordance with
chapter 3
(→
page 19) and the program switches were set properly according to the
application as described under
chapter 4.3/4.4
(→ page 29/30).
step 1
switch on the unit
→ Switch power “on“
→ Green LED
"analysis result" flashes.
green
step 2
+
reset reagent level
→ Press the INDICATOR and RESET
button at the same time
WARNING !!I
run reset function only when you have
replaced the empty bottle with a full one
(→ page 45)
step 3
fill measuring-chamber with water
→ Press the FLUSH button until the
measuring.-chamber
is
completely
filled with water and free of bubbles.
step 4
de-aerate dosing pump
→ Press the INDICATOR button until
reagent is delivered continuously into
the measuring-chamber.
→During this process, the stirrer rotates.
step 5
start analysis
→ Press START button to run first analysis
→ An analysis starts with the flushing of
the measuring-chamber
START
INDICATOR
RESET
FLUSH
INDICATOR
NOTE