C
HAPTER
4
O
PERATION AND
U
SE
P
AGE
29
4.3 Programme Switches
The Limit Analyser has 3 programme switches:
Rotary switch for determining
the flush time.
Rotary switch for
determining the delay time.
Programme switch for
configuring the operating
requirements.