Follow these steps monthly to test the system and ensure that the control panel is functioning
properly:
1
Place water on the cable.
2
Verify the Leak Detected alarm on the control panel.
3
Compare the distance reading on the LD5100 LCD to the reference map to verify that the
LD5100 displays the correct leak location.
4
Dry the cable and verify that the LD5100 returns to normal.
5
Remove the end-of-line terminator.
6
Verify the Cable Break alarm on the control panel.
7
Reinstall the end-of-line terminator.
8
Verify that the LD5100 returns to normal.
Monitor the cable current monthly to verify that the cable is not being contaminated. The
LD5100 will alarm on cable contamination if the contamination is excessive.
1
From the LD5100 display, press the “
Enter
” key and navigate to the Cable Status menu.
2
Be sure the cable current is less than 25
A. If the cable current is greater than 25
A, it is
recommended to troubleshoot the cables to determine which cable is contaminated. The
contaminated cable should be removed, cleaned, retested and reinstalled.
Summary of Contents for LD5100
Page 1: ...Leak Detection LD5100 User Guide...
Page 8: ...970 484 6510 8 rletech com Notes...
Page 11: ...970 484 6510 11 rletech com...
Page 12: ...970 484 6510 12 rletech com Notes...
Page 14: ...970 484 6510 14 rletech com Notes...
Page 24: ...www rletech com 24 970 484 6510 2 Connections and Settings Notes...
Page 30: ...www rletech com 30 970 484 6510 4 4 20mA Output Testing Notes...
Page 48: ...www rletech com 48 970 484 6510 7 EIA 232 Interface Notes...
Page 60: ...www rletech com 60 970 484 6510 A Updating Firmware Notes...
Page 66: ...www rletech com 66 970 484 6510 C Preventive Maintenance Notes...
Page 70: ...www rletech com 70 970 484 6510 D Troubleshooting Notes...