NOTE: VIEW FROM OUTSIDE.
Remove final bungee cord and repeat
steps 8.6A through 8.6C to install
next two W-1 panels and F-1 profiles.
W-1
W-1
F-1
W-1
S-2C
S-7
B-4
S-5B
2
2
7
6
3
1
Profile
Panel
Connector
QTY
QTY
QTY
56”
24” x 57”
8.6A
Continue working from back to install section five.
Remove plastic film from both sides of one W-1
panel. With side marked “ UV Resistant”
facing outside, install next panel at
slight angle on left. If necessary,
loosen the previous B-4
connector and profile and
move them towards the
back of the greenhouse
to make more room
to fit panel in place.
W-1
W-2
W-2
W-2
NOTE: VIEWS FROM OUTSIDE.
NOTE: VIEWS FROM OUTSIDE.
NOTE: VIEWS FROM OUTSIDE.
NOTE: VIEWS FROM OUTSIDE.
W-2
3
Panel
QTY
24” x 32
¼”
W-1
1
Panel
QTY
24” x 57”
8.6D
Remove plastic film from both sides of
second W-2 panel and repeat step 8.7B
to install in fouth section from back left.
F-1
F-1
F-1
W-1
W-2
8.6B
Remove plastic film from both sides of one W-2 panel. It will be
installed opposite the W-1 panel installed in 8.7A. From outside
position panel with extended ledge profile at outside top. Install
panel at slight angle sliding all the way into profile. Fit other end into
opposite profile. If necessary apply slight pressure to bend panel
and snap into place.
F-1
F-1
F-7
W-1
W-2
8.6c
Remove plastic film from both sides of second W-2 panel and
repeat step 8.7B to install in second section from back right.
F-1
F-7
F-1
W-1
W-2