WWW.RSIWW.COM
19 of 45
Assemble Left Wall
Make certain the pieces are in the correct positions before securing.
Carefully follow the order of assembly to ensure an easy installation.
Wear proper safety gear including work shoes, gloves and goggles.
QTY
Connector
B-3
S-2C
S-7
2
4
2
Profile
QTY
F-7
1
56”
Panel
QTY
W-1
1
24” x 57”
Remove plastic film and add the last W-1 panel to complete the side. From the outside, fit F-7
corner profile into place and use two B-3 connectors with T-bolt assemblies as shown to secure
to base.
4.2
F-7
B-3
B-3
QTY
Connector
B-3
S-2C
S-7
7
14
7
Panel
QTY
W-1
7
24” x 57”
56”
QTY
Profile
F-1
6
B-3
F-8
NOTE: VIEWS FROM INSIDE.
IMPORTANT: The panels expand and contract depending on the temperature.
To ensure proper placement, use the 23 1/8 inch spacer included with the tools.
Continue working from inside back left corner. Remove plastic film from
both sides of one W-1 panel. Fit panel into channel in base and corner
profile, placing side marked “ UV Resistant” facing outside.
4.1A
4.1B
Use B-3 connector with T-bolt
assembly plus an S-2C cap, as shown,
to secure to base.
4.1c
Continue building the side wall from the
inside. Use the spacer with each panel and
the six remaining F-1 profiles And W-1
panels. Repeat steps 4.1A through 4.1C.
4.1D
NOTE: Panels will not fit completely to end of
channels. There will be some space to allow for
temperature changes.
W-1
W-1
F-7
spacer tool
F-1
Place 23 1/8 inch spacer on base next to F-7
corner profile. Fit panel into channel in F-1 profile
and slide F-1 profile against spacer to ensure
proper placement.