background image

WWW.RSIWW.COM

20 of 45

G-1

G-1

G-2

G-2

G-2

NOTE: VIEWS FROM INSIDE.

NOTE: VIEW FROM INSIDE.

NOTE: At front and back, edge of G-1 gutter 

profile lines up flush with edge of F-7 corner profile.

Prepare two G-1 gutter profiles by sliding four T-bolts into bottom bolt track. 

Hand tighten each end T-bolt to hold in place. 

Prepare three G-2 gutter profile with six T-bolts and the other G-2 gutter 

profile with five T-bolts. Slide T-bolts into bottom bolt track.  

Hand tighten end T-bolt to hold in place. 

Working from inside, place G-1 and G-2 gutter profiles, fitting top edge of W-1 panels into 

channels of gutters. Place one short G-1 gutter profile at each end and the three longer 

G-2 gutter profiles in the center. Seams 

are centered to bolt tracks in F-1 profiles.  

Place one T-bolt on the inside bolt track of the gutter 

at each end. Hand tighten both T-bolts to hold in place.

4.3A       

4.3B    

4.4A      

4.4B    

S-7

25

QTY

Profile

2

G-1

G-2

3

25½”

48½”

G-1

F-7

W-1

W-1

W-1

W-1

F-7

F-1

F-1

G-1

G-2

G-1

W-1

F-7

F-7

G-1

W-1

S-7

2

NOTE: In some cases a ¼” x ¼” notch 

in top corner of W-1 panel will provide 

a better fit for G-1 gutter profile.

¼”

¼”

Summary of Contents for Mont-16-BK

Page 1: ...65 Fleetwood Drive Rockaway NJ 07866 Customer Service 877 373 3078 Email customerservice rsiww com After Hours Helpline 443 574 4764 8 x 16 Greenhouse Assembly Instructions Monticello Made in the USA...

Page 2: ...osed In cooler snow prone climates Cut some 2 x 4 s and put them against the roof ridge and the floor to help add support from heavy snow and ice This is just a precaution but could save a lot of aggr...

Page 3: ...so applies to any implied warranties that may exist under applicable law Some jurisdictions do not allow limitations on how long an implied warranty lasts so the above limitation may not apply to the...

Page 4: ...t in one staging area The List of Parts has the corresponding step number referenced to each part so you can easily prepare for each step We recommend placing all parts in one staging area Lay out par...

Page 5: ...n a cool dark place such as a garage until you are ready to use them Make sure the greenhouse complies with local building codes Heat the greenhouse during winter months to avoid accumulation of snow...

Page 6: ...ill be 101 by 1981 4 Materials Four 10 pressure treated 2x4 lumber cut to 97 Four 10 pressure treated 2x4 lumber uncut at 120 Four 8 pressure treated 2x4 lumber cut to 743 4 Eighty 8 3 wood screws Mak...

Page 7: ...leave the roof unattended until it is completely assembled Place all like parts together in a staging area Prepare for each step according to instructions in this manual If any parts are missing or da...

Page 8: ...2 Step 10 E 4 1 Step 10 B 2 5 Step 3 5 B 3 53 Steps 2 3 4 5 10 B 4 27 Step 8 B 5 24 Steps 1 2 4 7 B 7 6 Steps 5 6 7 B 8 4 Step 1 B 10 8 Step 7 B 1 6 Step 6 Door Profiles QTY QTY Profile 24 x 57 W 1 3...

Page 9: ...Anchors Brace Trim Plates Connectors Vent Opener QTY QTY QTY QTY QTY QTY QTY QTY T 3 T 4 G 3 A 1 A 2 B 9 T 2 S 10 1 3 4 8 8 3 1 1 Steps 2 3 4 Step 8 Step 8 Step 11 Step 11 Step 8 Steps1 2 3 4 5 6 7 8...

Page 10: ...e knocked around during installation On vertical profiles you will place bracket in place and push the T b through slot The T bolt will lock i On horizontal profiles the T bolts may be slotted into th...

Page 11: ...as shown Position P 2A and P 2B profiles at back sides of the greenhouse 1 1 WARNING Use extreme caution when handling profiles P 1A P 1B P 2A and P 2B The bottoms may have sharp edges near the drille...

Page 12: ...sure you have the correct number of T bolts in the correct bolt track in each profile The profiles have different amounts of T bolts on the inside and outside bolt tracks 1 2 NOTE Instructions identif...

Page 13: ...m inside corner Equal measurements ensure the base is square Use a spirit level to make sure the base is level 1 4A Locate predrilled holes in base profiles Use six S 4 screws one at each corner and o...

Page 14: ...nt facing outside The panels will help hold the profiles up during assembly 2 1B Continue working from inside Remove plastic film from both sides of one W 1 panel Fit panel into channel in base and co...

Page 15: ...ile into place and use two B 3 connectors with T bolt assemblies as shown to secure to base F 7 B 3 B 3 Slide four T bolts into bottom bolt track of G 1 gutter profiles Hand tighten each end T bolt to...

Page 16: ...it for G 1 gutter profile G 1 W 1 F 7 F 7 G 1 W 1 S 7 2 Working from inside place G 1 and G 2 gutter profiles fitting top edge of W 1 panels into channels of gutters Place one short G 1 gutter profile...

Page 17: ...rs on the outside of the greenhouse The B 3 connector uses the T bolt in the center hole of B 5 connectors at seams Loosen and slide T bolts to line up with connectors making sure the seams line up an...

Page 18: ...56 72 QTY Connector B 3 S 2C S 7 2 4 2 Panels QTY W 1 2 24 x 57 3 1a Working from inside remove plastic film from both sides of one W 1 panel Fit panel into channel in base and corner profile placing...

Page 19: ...ofile against spacer Repeat step 3 1C to secure WWW RSIWW COM 17 of 45 QTY Profile F 8 1 72 QTY Connector B 3 S 2C S 7 1 2 1 Panels QTY W 1 1 24 x 57 NOTE VIEW FROM INSIDE NOTE VIEW FROM outSIDE 3 2 R...

Page 20: ...dge of F 1 and F 7 vertical profiles Profiles will fit snugly 3 3A Working from inside right corner place F 6 profile with mitered end next to corner and angled edge facing up onto corner W 1 panel F...

Page 21: ...ontract depending on the temperature To ensure proper placement use the 23 1 8 inch spacer included with the tools Continue working from inside back left corner Remove plastic film from both sides of...

Page 22: ...and tighten end T bolt to hold in place Working from inside place G 1 and G 2 gutter profiles fitting top edge of W 1 panels into channels of gutters Place one short G 1 gutter profile at each end and...

Page 23: ...ter hole of B 5 connectors at seams Loosen and slide T bolts to line up with connectors making sure the seams line up and the gutters remain straight Beginning at the seams arrange T bolts so middle b...

Page 24: ...xactly as shown Use Phillips screwdriver to tighten S 7 bolts to hold D 8 hinges in place Turn profiles over Slide six T bolts into bolt track of both profiles and position as shown Fit B 2 connector...

Page 25: ...rner profile Position right F 8 profile so single T bolt is next to base on inside and the cut edge angled down toward the nearest corner when installed B 2 connector is pointing towards door opening...

Page 26: ...next to base on inside and the cut edge angled down toward the nearest corner when installed B 2 connector is pointing towards door opening Fit panel into channel in F 8 profile and slide F 8 profile...

Page 27: ...embly into the top slot of the B 2 place the B 2 in position and adjust T bolts to fit B 2 connector Secure with two additional S 2C caps Prepare D 7 latch Fit S 8 bolts in holes in D 7 latch Line up...

Page 28: ...ide Position door frame so barrel latch is on outside Loosen set screws on ends of F 5 profile and adjust position to fit holes in B 2 connector Secure with two bolts Ensure height to base is 68 Remov...

Page 29: ...end touches top of G 1 gutter Position both F 7 profiles Use C 1 connector with three T bolt assemblies to secure each outside corner Make sure all profiles line up flush against each other Repeat on...

Page 30: ...to B 1 connector with one T bolt assembly 6 1A Working from inside place F 2 profile on F 1 profile Make sure profiles are straight 6 1b From inside add connector B 7 to each corner Secure each with t...

Page 31: ...its against cut angle of F 8 profile One end touches top of gutter and top end touches edge of F 2 center profile Position both F 7 profiles Use C 1 connector with three T bolt assemblies to secure ea...

Page 32: ...oles in B 5 connector Position B 5 connector with the long hex bolt in center hole and center to the seam where the profiles join Repeat step 7 1 to install the second R 1E profiles next to R 1E profi...

Page 33: ...profiles Turn the roof ridge over so bolts face down and rest on top of front and back walls 7 3A Working from outside ensure all pieces are still flush and secure roof ridge to front Loosen set scre...

Page 34: ...tep and install and secure roof Do not leave roof unattended until it is completely assembled The roof panels are installed in the sections shown below Use two people and a step ladder to assemble the...

Page 35: ...in back left corner Fit one F 1 profile next to right panel F 1 profile rests against widest part of roof ridge and lines up with top of gutter Hold two profiles together at ridge using one B 4 connec...

Page 36: ...rked UV Resistant facing outside install the next panel on the right at the back Push panel into roof ridge channel until the other end rests on gutter ledge and then slide towards F 1 profile at back...

Page 37: ...l into roof ridge channel until the other end rests on gutter ledge and then slide towards F 1 profile at back Continue working from back to finish section three Remove plastic film from both sides of...

Page 38: ...bolt assembies 8 5f R 1 F 1 F 1 B 4 8 5A NOTE VIEW FROM OUTSIDE NOTE VIEW FROM OUTSIDE Remove next bungee cord and continue working from back to install section four Remove plastic film from both sid...

Page 39: ...OTE VIEWS FROM OUTSIDE NOTE VIEWS FROM OUTSIDE NOTE VIEWS FROM OUTSIDE NOTE VIEWS FROM OUTSIDE W 2 3 Panel QTY 24 x 32 W 1 1 Panel QTY 24 x 57 8 6D Remove plastic film from both sides of second W 2 pa...

Page 40: ...S 2C caps The G 4 and G 4E trim plates snap into G 1 and G 2 gutter profiles to hold roof panels in place Working from outside begin at front corner Run a bead of silicone sealant along ledge of G 1...

Page 41: ...if necessary Secure with a threaded stud on each side Repeat steps 9 1A through 9 1D to prepare the two more Automatic Window Openers Remove plastic film from both sides of V 2 factory assembled vents...

Page 42: ...sting screw can move freely Screw two S 1 screws through panel and into gripping channel on other side to secure Do not over tighten as it may damage the vent From inside screw S 6 screw and spacer in...

Page 43: ...Begin right door assembly Prepare one E 2 door profile Position with holes facing up Slide one D 9 corner connector into each end Slide E 1 door profiles into D 9 corner connectors and secure each wit...

Page 44: ...in step 10 6B Turn door over and install handle on E 2 profile just secured Match two holes in E 2 with holes in D 6 handle Secure with two S 10 screws Repeat step 10 1 through 10 2A to assemble left...

Page 45: ...and F 5 profiles that make up the door frame and to inside E 1 bottom door profiles This tape acts as insulation Make sure it is smooth and even Working from inside with left door open and right door...

Page 46: ...latform until each screw is flush with base profile Continue process around outside and inside until greenhouse is evenly secured Attach anchor bracket with two T bolts in the inside bolt channels in...

Reviews: