Reinstall the velcro strap around the nano head and harness.
9
Using the Phillips head screwdriver and eight screws previously removed, re-attach the
nano head cover onto the Phoenix nano dispenser.
2. Note the serial number on the label of the nano dispenser pneumatic tube near the controller
box (also printed on the replacement nano dispenser package).
3. Update the software calibration file to recognize the new nano valve harness assembly.
1
Check that the Phoenix software is shut down.
2
Go to the following directory :
..\Phoenix\RobbinsNanoCalibration\RobbinsNanoHardwareCalibration\
3
Change the prefix of the removed Valve Harness Assembly Hardware Calibration file (if
one exists) to "CHxx...".
For example "CH01-H0001.xml" would change to "CHxx-H0001.xml". This will deactivate
the removed Valve Assembly’s Hardware Calibration.
4
Select the Hardware Calibration file for the new Valve Assembly either in the same
directory, a sub directory, or sent with new the new Valve Assembly.
Change the prefix to start with the channel it was placed into. For example if harness
H0002 is placed into channel 1, change "CHxx-H0002.xml" to "CH01-H0002.xml.
Make sure the new harness’s Hardware Calibration file is located in the same location at:
...\Phoenix\RobbinsNanoCalibration\RobbinsNanoHardwareCalibration\
While CHXX such as CH01, CH02, etc. must be the first four characters of the file name,
for the calibration file to be recognized, the naming convention of any other information
in the file name is arbitrary.
5
Restart the Phoenix software.
6
Look at the log file: "...\Phoenix\Logs\Phoenix.log" to see that the correct Hardware
Calibration file has been associated with the correct channel.
Search for the words "hardware calibration" starting from the bottom of the file to find the
correct line.
The name of the XML file should be seen as in this example:
CH01 is using hardware calibration file: CHxx_H00xx.xml Date.
This completes the Nano Valve Harness Assembly Exchange and Hardware Calibration.
Note: The Excel file for each Nano harness is the final measurement of performance at
ARI. The associated CHXX .XML file is the file, read by the software, that results in those
measurements.
4. Check that all connections and tubing is tight.
5. Turn on the power for the nano controller box and the Phoenix HT instrument. Re-establish
the software connection with the instrument by selecting
Connect
on the
Phoenix
software.
6. Do a protocol test run to confirm that all parts are full operational.