2788
4
GB
3.3
HYDRAULIC SYSTEMS
H
= difference of level;
L
= max. length of the suction line;
I. D.
= internal diameter of the oil pipes.
Fig. 8
D5745
H
max.
4 m
➤
The pump is designed to allow working with two pipes.
In order to obtain one pipe working it is necessary to unscrew
the pin (2), remove the by-pass screw (3) and then screw again
the pin (2), (see fig. 7).
➤
It is necessary to install a filter on the fuel supply line.
➤
Before starting the burner make sure that the return pipe-line is
not clogged. An excessive back pressure would cause the
damage of the pump seal.
WARNING:
H
meters
L meters
I. D.
8 mm
I. D.
10 mm
0.5
1
1.5
2
10
20
40
60
20
40
80
100
H
meters
L meters
I. D.
8 mm
I. D.
10 mm
0
0.5
1
1.5
2
3
3.5
35
30
25
20
15
8
6
100
100
100
90
70
30
20
PRIMING PUMP:
On the system in fig. 8
it is sufficient to loosen the suction gauge connection
(6, fig. 7) and wait until oil flows out.
On the systems in fig. 9 and 10
start the burner and wait for the priming.
Should lock-out occur prior to the arrival of the fuel, await at least 20 seconds
before repeating the operation.
The pump suction should not exceed a maximum of 0.4 bar (30 cm Hg).
Beyond this limit gas is released from the oil. Oil pipes must be completely tight.
In the vacuum systems (fig. 10) the return line should terminate within the oil tank
at the same level as the suction line. In this case a non-return valve is not
required. Should however the return line arrive over the fuel level, a non-
return valve is required. This solution however is less safe than previous one,
due to the possibility of leakage of the valve.
SYSTEM NOT PERMITTED
IN GERMANY
H
max
. 4 m
max
. 4 m
H
H
H
D5744
Fig. 9
Fig. 10
1 - Suction line
2 - Return line
3 - By-pass screw
4 - Gauge connection
5 - Pressure adjuster
6 - Suction gauge connection
7 - Valve
2
D5527
3
5
6
7
1
4
Fig. 7
Summary of Contents for Gulliver RG5S
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ...RIELLO S p A I 37048 San Pietro di Legnago VR Tel 39 0442 630111 http www riello it...