27
INSTALLER
Models RTS 1012÷1850 2S
- Push out the pre-formed cutouts in the boiler’s side
panel ((4) or (5) depending on what side you want
to install the control panel) corresponding to the oval
cable grommets in the control panel.
- Perforate the membranes of the control panel cable
grommets. Route the electrical cables through them
and insert the sensors in their sockets.
- Fix the control panel (12) to the boiler casing using the
screws provided.
- Fit the side rails (1) and cross members (2).
- Engage the bottoms of the rear side panels (6 and 3),
central side panels (13 and 14), and front side panels
(4 and 5) in the bottom rails of the base, then hook their
top lips over the top rails (1) running between the front
and rear heads.
- Secure the side panels in place with the top cross
beams (7) and the screws provided.
- Fit your chosen control panel (
r
5000
or
r
TECH
) on the left panel (4) or right panel (5) as
instructed in the control panel’s own instruction manual.
- Route the electrical cables and insert the sensors in
their sockets.
b
Use the copper socket (P) to insert the sensors
of the safety devices (see the “Location of sen-
sors” section).
- Fit the cable grommets provided into their seats in the
panels.
- Fit the rear top panel (15), the central top panels (8
and 9) and the front top panel (10) to close the top of
the boiler.
- Once all the panels are in place, fit the front cover (11)
over the top of the door.
P
7
5
13
6
11
8
3
14
10
4
9
15
2
1
r
TECH
12
12
r
5000