
3.6 MOUNTING THE COVERS
1. Press up the re-
lease handle [D]
and open the upper
unit.
2. Install the right in-
ner cover [E] and
the bracket [F] on
the lower unit. (Use
2 pan-head screws
for the bracket. Use
1 flat-head screw
and 3 pan-head
screws for the right
inner cover.)
3. Install the right mid-
dle cover. (4 screws)
4. Install the left inner
cover [G] on the
lower unit. (2 flat-
head and 5 pan-
head screws)
5. Install the left mid-
dle cover.
(4 screws)
D
E
F
G
6 January 1990
3-13
Summary of Contents for FW 810
Page 1: ...SECTION 1 OVERALL MACHINE INFORMATION...
Page 22: ...SECTION 2 DETAILED SECTION DESCRIPTIONS...
Page 73: ...SECTION 3 INSTALLATION...
Page 88: ...SECTION 4 SERVICE TABLES...
Page 122: ...SECTION 5 REPLACEMENT AND ADJUSTMENT...
Page 152: ...5 Clean the toner overflow sensor E with a blower brush or equiva lent E 6 January 1990 5 30...