
1.2 PLANT ENGINEERING REQUIREMENTS
1.3 CONNECTIONS TO THE TERMINAL BLOCK PCB
Fig. 3: Positions of the three essential parts in the system, to simultaneously control a high temperature collector and a low temperature one (mixing
valve, pump and temperature probe).
Fig. 4: Essential connections for the simultaneous control of a radiant system and a fancoil one
NOTE: The KCTR is not essential, and to start up ELECTA it can be replaced by a switch that either short circuits the L-K terminals or that switches
the terminal block phase to terminal J.
1.
Place the mixing valve between the high and low temperature collectors, so that the water sent to the low temp. Collector is a mixture of its own
return water and the water from the high temp. collector.
2.
6HWXSDNȍUHVLVWRULQSDUDOOHOEHWZHHQWKH*DQG<ZLUHV7KLVUHVLVWRUPXVWEHVHWXSDVFORVHDVSRVVLEOHWRWKH0L[LQJYDOYHWRDYRLGDQ\
signal interference.
3.
Set up a pump downstream to the Mixing valve.
4.
3ODFHDNȍWHPSHUDWXUHVHQVRUDW&DWWKHLQOHWRIWKHORZWHPS&ROOHFWRU
NOTE: Maximum length of 30m.
296
Enclosed documents
EN
Summary of Contents for ELECTA Series
Page 40: ...Connessioni sulla TERMINAL BLOCK KEAP 40 Sezione II Installazione e manutenzione IT ...
Page 95: ...Connections on the TERMINAL BLOCK KEAP 95 Section II Installation and maintenance EN ...
Page 151: ...Connexions sur la TERMINAL BLOCK KEAP 151 Section II Installation et entretien FR ...
Page 207: ...Anschlüsse an den TERMINAL BLOCK KEAP 207 Leitungsquersch II Installation und Wartung DE ...
Page 263: ...Conexiones en la TERMINAL BLOCK KEAP 263 Sección II Instalación y mantenimiento ES ...
Page 342: ...342 ...
Page 343: ...343 ...