Assembly Procedure for T-BOX
Assembly can be accomplished by reversing the disassembly procedure.
Mnt-R-0263
.
Step I.
Install spacer (21), gear (22), and bearing cones (7) onto shaft. If any shims were present between gear and
bearing or gear and spacer always reinstall at same location. Make sure that all parts are fully slated.
Step II.
Press new bearing cups into side caps (4).
Step III.
Assemble side cap (4) which was against the gear onto main housing using same shim pack as when
disassembled. If shim pack is not available use 0.030 inches of total shim thickness. Install capscrews and
tighten to recommended torque. Install three shaft assembly into housing with gear against the first side cap.
Step IV.
Assemble second side cap (4) onto main housing (1) using same shim pack as when disassembled or if not
available use 0.030 inch shim between cap and housing. Install capscrews (3) and tighten.
Step V.
Check bearing adjustment on rolling torque on cross shaft. If any play exists in shaft, shims must be removed
from side cap or cap opposite gear (22). Proper rolling torque should be 10 to 12 inch pounds. If preload is to
tight shims must be added under side cap opposite gear.
Step VI.
Input Hub Assembly
Press bearing cups into hub making sure they are fully seated. Press bearing cone onto shaft properly seated
against shaft shoulder. Assemble shaft into hub (11), add second bearing cone and gear. Apply a thin coat of
Liquid Lock to the shaft threads. Assemble adjusting nut and tighten to insure that all parts are seated. Then
loosen the adjusting nut until a rolling torque of 10 to 12 inch pounds is reached. Insert cotter pin through shaft
and adjusting nut. Bend cotter pin ends around radial surface of nut.
Do Not Bend Cotter Over End of Shaft.
Step VII.
Assemble input hub into main housing using same shim pack as when disassembled. If not available use.020
inch shim to start. Install capscrews and tighten to recommended torque.
Step VIII.
Check backlash between gear set. Backlash should be 0.012 to 0.024 inches. If backlash is to small add shims
between main housing and input hub. Remove shims for excessive backlash.
Step IV.
Remove side caps one at a time, seal with sealer and reinstall. Repeat process for input hub assembly.
Gearbox is ready to be filled with good grade of NLGI 000 Grease. See maintenance section for specifications.
Summary of Contents for Turbo 120
Page 2: ......
Page 10: ......
Page 11: ...Safety Section 1 1 2012 Alamo Group Inc SAFETY SECTION...
Page 30: ...SAFETY TURBO 120 08 12 Safety Section 1 20 2012 Alamo Group Inc SAFETY Decal Description...
Page 31: ...SAFETY TURBO 120 08 12 Safety Section 1 21 2012 Alamo Group Inc SAFETY...
Page 32: ...SAFETY TURBO 120 08 12 Safety Section 1 22 2012 Alamo Group Inc SAFETY...
Page 33: ...SAFETY TURBO 120 08 12 Safety Section 1 23 2012 Alamo Group Inc SAFETY...
Page 34: ...SAFETY TURBO 120 08 12 Safety Section 1 24 2012 Alamo Group Inc SAFETY...
Page 35: ...SAFETY TURBO 120 08 12 Safety Section 1 25 2012 Alamo Group Inc SAFETY...
Page 36: ...SAFETY TURBO 120 08 12 Safety Section 1 26 2012 Alamo Group Inc SAFETY...
Page 37: ...SAFETY TURBO 120 08 12 Safety Section 1 27 2012 Alamo Group Inc SAFETY...
Page 38: ...SAFETY TURBO 120 08 12 Safety Section 1 28 2012 Alamo Group Inc SAFETY...
Page 40: ......
Page 41: ......
Page 67: ......
Page 93: ...Introduction Section 2 1 2012 Alamo Group Inc INTRODUCTION SECTION...
Page 98: ......
Page 99: ...Assembly Section 3 1 2012 Alamo Group Inc ASSEMBLY SECTION...
Page 111: ...Operation Section 4 1 2012 Alamo Group Inc OPERATION SECTION...
Page 160: ......
Page 161: ...Maintenance Section 5 1 2012 Alamo Group Inc MAINTENANCE SECTION...
Page 164: ...MAINTENANCE TURBO 120 08 12 Maintenance Section 5 4 2012 Alamo Group Inc MAINTENANCE...
Page 165: ...MAINTENANCE TURBO 120 08 12 Maintenance Section 5 5 2012 Alamo Group Inc MAINTENANCE...
Page 166: ...MAINTENANCE TURBO 120 08 12 Maintenance Section 5 6 2012 Alamo Group Inc MAINTENANCE...
Page 167: ...MAINTENANCE TURBO 120 08 12 Maintenance Section 5 7 2012 Alamo Group Inc MAINTENANCE...
Page 183: ...MAINTENANCE TURBO 120 08 12 Maintenance Section 5 23 2012 Alamo Group Inc MAINTENANCE...
Page 193: ...SEGURIDAD TURBO 120 08 12 Secci n de Seguridad 1 24 2012 Alamo Group Inc SEGURIDAD...
Page 194: ...SEGURIDAD TURBO 120 08 12 Secci n de Seguridad 1 23 2012 Alamo Group Inc SEGURIDAD...
Page 195: ...SEGURIDAD TURBO 120 08 12 Secci n de Seguridad 1 22 2012 Alamo Group Inc SEGURIDAD...
Page 196: ...SEGURIDAD TURBO 120 08 12 Secci n de Seguridad 1 21 2012 Alamo Group Inc SEGURIDAD...
Page 197: ...SEGURIDAD TURBO 120 08 12 Secci n de Seguridad 1 20 2012 Alamo Group Inc SEGURIDAD...
Page 198: ...SEGURIDAD TURBO 120 08 12 Secci n de Seguridad 1 19 2012 Alamo Group Inc SEGURIDAD...
Page 199: ...SEGURIDAD TURBO 120 08 12 Secci n de Seguridad 1 18 2012 Alamo Group Inc SEGURIDAD...
Page 200: ...SEGURIDAD TURBO 120 08 12 Secci n de Seguridad 1 17 2012 Alamo Group Inc SEGURIDAD...
Page 201: ...SEGURIDAD TURBO 120 08 12 Secci n de Seguridad 1 16 2012 Alamo Group Inc SEGURIDAD...
Page 216: ...Secci n de Seguridad 1 1 2012 Alamo Group Inc SECCI N DE SEGURIDAD...
Page 217: ......