MAINTENANCE
TURBO 120 08/12
Maintenance Section 5-8
© 2012 Alamo Group Inc.
MAINTENANCE
GEARBOX
The Gearbox has been filled with lubricant to the Dipstick level prior to shipment. However, you should check
the oil level at Dipstick before operating, and frequently thereafter.
The gearbox should not require additional lubricant unless the box is cracked or a seal is leaking. It is
recommended that the Dipstick be removed after every 8 to 10 hours of operation and oil added until it is at
proper level.
MntP-R-0052, MntP-R-0053.
Required lubricant is Multi-Purpose Gear Oil P/N 00786250. The outer gearbox capacity is 6-1/2 quarts and
the center gearbox has a capacity of 5 quarts.
NOTE: Overfilling the Gearbox will cause pressure to build up and cause Oil Seals to leak.
ATTENTION: If the Gearbox suddenly starts making an unusual noise, stop at once, check for leaks, and refill
Gearbox as required.
SECONDARY GEARBOX
CENTER GEARBOX
Summary of Contents for Turbo 120
Page 2: ......
Page 10: ......
Page 11: ...Safety Section 1 1 2012 Alamo Group Inc SAFETY SECTION...
Page 30: ...SAFETY TURBO 120 08 12 Safety Section 1 20 2012 Alamo Group Inc SAFETY Decal Description...
Page 31: ...SAFETY TURBO 120 08 12 Safety Section 1 21 2012 Alamo Group Inc SAFETY...
Page 32: ...SAFETY TURBO 120 08 12 Safety Section 1 22 2012 Alamo Group Inc SAFETY...
Page 33: ...SAFETY TURBO 120 08 12 Safety Section 1 23 2012 Alamo Group Inc SAFETY...
Page 34: ...SAFETY TURBO 120 08 12 Safety Section 1 24 2012 Alamo Group Inc SAFETY...
Page 35: ...SAFETY TURBO 120 08 12 Safety Section 1 25 2012 Alamo Group Inc SAFETY...
Page 36: ...SAFETY TURBO 120 08 12 Safety Section 1 26 2012 Alamo Group Inc SAFETY...
Page 37: ...SAFETY TURBO 120 08 12 Safety Section 1 27 2012 Alamo Group Inc SAFETY...
Page 38: ...SAFETY TURBO 120 08 12 Safety Section 1 28 2012 Alamo Group Inc SAFETY...
Page 40: ......
Page 41: ......
Page 67: ......
Page 93: ...Introduction Section 2 1 2012 Alamo Group Inc INTRODUCTION SECTION...
Page 98: ......
Page 99: ...Assembly Section 3 1 2012 Alamo Group Inc ASSEMBLY SECTION...
Page 111: ...Operation Section 4 1 2012 Alamo Group Inc OPERATION SECTION...
Page 160: ......
Page 161: ...Maintenance Section 5 1 2012 Alamo Group Inc MAINTENANCE SECTION...
Page 164: ...MAINTENANCE TURBO 120 08 12 Maintenance Section 5 4 2012 Alamo Group Inc MAINTENANCE...
Page 165: ...MAINTENANCE TURBO 120 08 12 Maintenance Section 5 5 2012 Alamo Group Inc MAINTENANCE...
Page 166: ...MAINTENANCE TURBO 120 08 12 Maintenance Section 5 6 2012 Alamo Group Inc MAINTENANCE...
Page 167: ...MAINTENANCE TURBO 120 08 12 Maintenance Section 5 7 2012 Alamo Group Inc MAINTENANCE...
Page 183: ...MAINTENANCE TURBO 120 08 12 Maintenance Section 5 23 2012 Alamo Group Inc MAINTENANCE...
Page 193: ...SEGURIDAD TURBO 120 08 12 Secci n de Seguridad 1 24 2012 Alamo Group Inc SEGURIDAD...
Page 194: ...SEGURIDAD TURBO 120 08 12 Secci n de Seguridad 1 23 2012 Alamo Group Inc SEGURIDAD...
Page 195: ...SEGURIDAD TURBO 120 08 12 Secci n de Seguridad 1 22 2012 Alamo Group Inc SEGURIDAD...
Page 196: ...SEGURIDAD TURBO 120 08 12 Secci n de Seguridad 1 21 2012 Alamo Group Inc SEGURIDAD...
Page 197: ...SEGURIDAD TURBO 120 08 12 Secci n de Seguridad 1 20 2012 Alamo Group Inc SEGURIDAD...
Page 198: ...SEGURIDAD TURBO 120 08 12 Secci n de Seguridad 1 19 2012 Alamo Group Inc SEGURIDAD...
Page 199: ...SEGURIDAD TURBO 120 08 12 Secci n de Seguridad 1 18 2012 Alamo Group Inc SEGURIDAD...
Page 200: ...SEGURIDAD TURBO 120 08 12 Secci n de Seguridad 1 17 2012 Alamo Group Inc SEGURIDAD...
Page 201: ...SEGURIDAD TURBO 120 08 12 Secci n de Seguridad 1 16 2012 Alamo Group Inc SEGURIDAD...
Page 216: ...Secci n de Seguridad 1 1 2012 Alamo Group Inc SECCI N DE SEGURIDAD...
Page 217: ......