OPERATION
RC115/118/120/125 02/12
Operation Section 4-37
© 2012 Alamo Group Inc.
OPERA
T
ION
15.2 Hauling the Tractor and Implement
Before transporting a loaded tractor and implement,
measure the height and width dimensions and gross
weight of the complete loaded unit. Ensure that the
load will be in compliance with the legal limits set for
the areas that will be traveled through.
OPS-U- 0024
Use adequately sized and rated trailers and
equipment to transport the tractor and implement.
Consult an authorized dealer to determine the proper
equipment required. Using adequately sized chains,
heavy duty straps, cables and/or binders, securely tie
down both the front and rear of the tractor utilizing the
proper tie down locations as specified by the tractor
manufacturer.
OPS-U- 0025
Arrange the chains so that when tightened, the
chains are pulling downward and against
themselves. Carefully tighten the securing chains or
other fasteners using boomers or binders to apply
maximum tension. Use extreme care when
attaching and removing the securing devices as the
extreme tension involved when released has the
potential to inflict serious injury.
While hauling the tractor and implement, make
occasional stops to check that the tractor and
implement have not moved or shifted and that the
securing chains have maintained tension. If during
transport a hard braking, sharp turning, or swerving
action was performed, stop at the next safe location
to inspect the security of the load.
OPS-U- 0026
Summary of Contents for RC 115
Page 6: ......
Page 10: ......
Page 11: ...Safety Section 1 1 2012 Alamo Group Inc SAFETY SECTION...
Page 28: ...SAFETY RC115 118 120 125 02 12 Safety Section 1 18 2012 Alamo Group Inc SAFETY...
Page 29: ...SAFETY RC115 118 120 125 02 12 Safety Section 1 19 2012 Alamo Group Inc SAFETY...
Page 30: ...SAFETY RC115 118 120 125 02 12 Safety Section 1 20 2012 Alamo Group Inc SAFETY...
Page 31: ...SAFETY RC115 118 120 125 02 12 Safety Section 1 21 2012 Alamo Group Inc SAFETY...
Page 32: ...SAFETY RC115 118 120 125 02 12 Safety Section 1 22 2012 Alamo Group Inc SAFETY...
Page 33: ...SAFETY RC115 118 120 125 02 12 Safety Section 1 23 2012 Alamo Group Inc SAFETY...
Page 34: ...SAFETY RC115 118 120 125 02 12 Safety Section 1 24 2012 Alamo Group Inc SAFETY...
Page 36: ......
Page 37: ...Introduction Section 2 1 2012 Alamo Group Inc INTRODUCTION SECTION...
Page 42: ......
Page 43: ...Assembly Section 3 1 2012 Alamo Group Inc ASSEMBLY SECTION...
Page 48: ......
Page 49: ...Operation Section 4 1 2012 Alamo Group Inc OPERATION SECTION...
Page 88: ......
Page 89: ...Maintenance Section 5 1 2012 Alamo Group Inc MAINTENANCE SECTION...
Page 108: ...MAINTENANCE RC115 118 120 125 02 12 Maintenance Section 5 20 2012 Alamo Group Inc MAINTENANCE...
Page 109: ......
Page 122: ...Secci n de Seguridad 1 1 2012 Alamo Group Inc SECCI N DE SEGURIDAD...
Page 123: ......