MAINTENANCE
RC115/118/120/125 02/12
Maintenance Section 5-6
© 2012 Alamo Group Inc.
MAINTENANCE
ROUTINE MAINTENANCE:
1. Inspect belt drive for correct tension and remove
any debris from inside belt shields. Incorrect
tension will result in premature belt failure. Check
belt tension after first hour of operation.
Mnt-FL-
0029_A.
2. Inspect for and tighten any loose fasteners.
3. Routinely inspect cutter shaft for missing or worn
knives. Replace knives as outlined in Blade
Replacement Procedure.
Mnt-FL-0037.
4. Clear any debris from gear box area, to prevent
overheating. Clean area around breather plug
regularly.
5. Always ensure all hitch pins and clips are locked in
place before operation.
6. Inspect bearing assemblies to ensure locking
collars are locked in place.
7. All shielding must be in place before operating
shredder. Inspect front rubber shield for wear and
replace if necessary.
CUTTER SHAFT
Routinely inspect cutter shaft for and replace any worn or damaged blades. When replacing worn blades
always replace blade set directly opposite, (180 degrees) otherwise cutter shaft will be out of balance. Inspect
bushing and bolt for wear and replace if necessary. Remove any debris which may become entangled around
cutter shaft or bearings. Stop machine at first sign of excessive vibration and inspect cutter shaft and bearings.
BLADE REPLACEMENT
1. Remove locknut (item 1), bolt (item 2), and
inspect bushing (item 3) and bolt for wear.
Replace if worn.
2. Place new knives on bushing and insert between
reel clip. Tighten to 60 ft. lbs.
Summary of Contents for RC 115
Page 6: ......
Page 10: ......
Page 11: ...Safety Section 1 1 2012 Alamo Group Inc SAFETY SECTION...
Page 28: ...SAFETY RC115 118 120 125 02 12 Safety Section 1 18 2012 Alamo Group Inc SAFETY...
Page 29: ...SAFETY RC115 118 120 125 02 12 Safety Section 1 19 2012 Alamo Group Inc SAFETY...
Page 30: ...SAFETY RC115 118 120 125 02 12 Safety Section 1 20 2012 Alamo Group Inc SAFETY...
Page 31: ...SAFETY RC115 118 120 125 02 12 Safety Section 1 21 2012 Alamo Group Inc SAFETY...
Page 32: ...SAFETY RC115 118 120 125 02 12 Safety Section 1 22 2012 Alamo Group Inc SAFETY...
Page 33: ...SAFETY RC115 118 120 125 02 12 Safety Section 1 23 2012 Alamo Group Inc SAFETY...
Page 34: ...SAFETY RC115 118 120 125 02 12 Safety Section 1 24 2012 Alamo Group Inc SAFETY...
Page 36: ......
Page 37: ...Introduction Section 2 1 2012 Alamo Group Inc INTRODUCTION SECTION...
Page 42: ......
Page 43: ...Assembly Section 3 1 2012 Alamo Group Inc ASSEMBLY SECTION...
Page 48: ......
Page 49: ...Operation Section 4 1 2012 Alamo Group Inc OPERATION SECTION...
Page 88: ......
Page 89: ...Maintenance Section 5 1 2012 Alamo Group Inc MAINTENANCE SECTION...
Page 108: ...MAINTENANCE RC115 118 120 125 02 12 Maintenance Section 5 20 2012 Alamo Group Inc MAINTENANCE...
Page 109: ......
Page 122: ...Secci n de Seguridad 1 1 2012 Alamo Group Inc SECCI N DE SEGURIDAD...
Page 123: ......