MAN1910117 V.7 – 15/11/2012
10
WARNING: the opening and switching on of the machine with the door open
(unless for cleaning operations) must be carried out only by authorised, qualified
personnel. Do not leave the machine open unguarded.
WARNING: removing the coffee beans canister a micro-switch
cuts the power off
grinder in the machine.
10.3 Diagnostics cycle of the switching up
At the starting the machine carries out a diagnostics cycle to check the position of the mobile components, the
correct quantity of some ingredients and the correct water mains supply pressure. At the end of checks, the
standard invitation message will appear on the display, e.g.:
rheavendors group
- - - - - - - - - - - - - - -
version 2.4
24 - 04 - 03
the date of the update of the software and the version of the master loaded into the machine (e.g.: 2.2).
switching on
please wait
Only during the First Installation
, at this point, the machine makes some specific operations. They are described
in the paragraph “
Start up operations
”. At the end of all tests the display shows the message:
rheavendors
xx oc
place
your cup
11 Start-up operations
11.1 First installation phase
During the First installation phase water is filled inside the water tank and the boiler. Then it is necessary to set the
correct boiler’s temperature.
11.1.1 Loading the boiler
Make sure that the liquid waste bucket is correctly placed.
Version R
- Open the tap of the water circuit.
Version A
– Fill the blue water tank.
Open the front door. Insert the plastic key into the safety switch and turn on the machine.
rheavendors
16-11- 05