GENERAL
The liferaft is to be inspected two (2) years after the date of manufacture and annually after the initial
inspection. This will insure that the inflatable chamber will maintain the specified pressure, that the
inflation system functions efficiently, and that all components and associated equipment are maintained
in a serviceable condition.
Replace the PFD Light if it will expire before the next inspection. If the life raft needs to be serviced at
any point within the requirement period, confirm the expiration date on the light and inspect for
damage. Replace if necessary.
Check floating knife for any cracks in plastic. Replace if necessary.
Fabric
Inspect all fabric components for:
•
Slits, tears, and holes
•
Pigment removal
•
Deterioration
•
Adhesion of seams and components
•
Separation of RF welds
•
Condition of sown seams
•
Legibility of all instructions and labels
Replace parts as necessary
Metal
Examine for:
•
Cleanliness
•
Cracks
•
Distortion
•
Scoring and burrs
•
Damaged threads
•
Fraying cables
•
Corrosion
Replace parts as necessary
Webbing, Cordage, Ropes, and ‘Velcro’ Strips
Check for:
•
Damage and fraying
•
Discoloration and deterioration, including the material in contact with them
•
Incomplete adhesion to fabric
•
Broken stitching
Replace parts as necessary
June 2/08
9102
6 - 3
Summary of Contents for 45-CC2V
Page 2: ......
Page 4: ...June 2 08 RR 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 10: ...June 2 08 SB 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 28: ......
Page 33: ...LIST OF ASSOCIATED PUBLICATIONS June 2 08 9102 AP 1 AP None Listed...
Page 34: ...June 2 08 AP 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 36: ...June 2 08 AB 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 38: ...June 2 08 TC 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 1 2 9102...
Page 44: ...June 2 08 2 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 50: ...FIGURE 2 VALISE June 2 08 2 8 9102...
Page 51: ...FIGURE 3 GAS INFLATION SYSTEM May 29 13 9102 2 9...
Page 54: ...FIGURE 4 RAFT DIMENSIONS Jan 18 11 2 12 9102...
Page 56: ...FIGURE 5 DEPLOYMENT Jan 18 11 2 14 9102...
Page 57: ...FIGURE 6 CANOPY ATTACHMENT Jan 18 11 9102 2 15...
Page 58: ...Jan 18 11 2 16 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 59: ...DISASSEMBLY 3 General 3 Procedures 5 June 2 08 9102 3 1...
Page 60: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 3 2 9102...
Page 62: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 3 4 9102...
Page 65: ...FIGURE 3 DISCONNECTING THE CYLINDER NECK LOOP Jan 18 11 9102 3 7...
Page 66: ...FIGURE 4 UNFOLD RAFT DISENGAGE THE CYLINDER Jan 18 11 3 8 9102...
Page 68: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 2 9102...
Page 70: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 4 9102...
Page 72: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 6 9102...
Page 74: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 8 9102...
Page 79: ...FIGURE 1 DIGITAL MANOMETER P N 95 41129 101 May 29 13 9102 4 13...
Page 85: ...CLEANING June 2 08 9102 5 1 5 General 3 Procedures 5 A Liferafts 5 B Valise 5...
Page 86: ...June 2 08 5 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 88: ...June 2 08 5 4 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 90: ...June 2 08 5 6 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 92: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 6 2 9102...
Page 94: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 6 4 9102...
Page 96: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 6 6 9102...
Page 98: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 6 8 9102...
Page 100: ...THIS PAGE IS INTENTIONALLY LEFT BLANK June 2 08 7 2 9102...
Page 102: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 7 4 9102...
Page 109: ...FIGURE 1 PATCHES AND TAPE APPLICATION June 2 08 9102 7 11...
Page 110: ...FIGURE 2 PATCH APPLICATION OVER SEAM May 29 13 7 12 9102...
Page 112: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 7 14 9102...
Page 114: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 8 2 9102...
Page 116: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 8 4 9102...
Page 119: ...FIGURE 2C FOLDING SEA ANCHOR FIGURE 2D PAINTERLINE PREPARATION Jan 18 11 9102 8 7...
Page 137: ...FIGURE 3 TOPPING OFF INFLATE DEFLATE VALVE FIGURE 4 ATTACHING THE CYLINDER June 2 08 9102 8 25...
Page 138: ...FIGURE 5 STORAGE OF COMPONENTS Jan 18 11 8 26 9102...
Page 140: ...FIGURE 6B CC2 FOLDING DIAGRAM STEP 2 June 2 08 8 28 9102...
Page 141: ...FIGURE 6C CC2 FOLDING DIAGRAM STEP 3 June 2 08 9102 8 29...
Page 142: ...FIGURE 6D CC2 FOLDING DIAGRAM STEP 4 D 53 25in June 2 08 8 30 9102...
Page 143: ...FIGURE 6E CC2 FOLDING DIAGRAM STEP 5 June 2 08 9102 8 31...
Page 144: ...FIGURE 6G CC2 FOLDING DIAGRAM CC4 STEP 7 June 2 08 8 32 9102...
Page 145: ...FIGURE 7A CC4 FOLDING DIAGRAM STEP 1 Jan 18 11 9102 8 33...
Page 146: ...FIGURE 7B CC4 FOLDING DIAGRAM STEP 2 Jan 18 11 8 34 9102...
Page 147: ...FIGURE 7C CC4 FOLDING DIAGRAM STEP 3 Jan 18 11 9102 8 35...
Page 148: ...FIGURE 7D CC4 FOLDING DIAGRAM STEP 4 Jan 18 11 8 36 9102...
Page 149: ...FIGURE 7E CC4 FOLDING DIAGRAM STEP 5 Jan 18 11 9102 8 37...
Page 150: ...FIGURE 7F CC4 FOLDING DIAGRAM STEP 6 D 71in Jan 18 11 8 38 9102...
Page 151: ...FIGURE 7G CC4 FOLDING DIAGRAM STEP 7 Jan 18 11 9102 8 39...
Page 152: ...FIGURE 7I CC4 FOLDING DIAGRAM STEP 9 Jan 18 11 8 40 9102...
Page 153: ...FIGURE 8A CC6 FOLDING DIAGRAM STEP 1 Jan 18 11 9102 8 41...
Page 154: ...FIGURE 8B CC6 FOLDING DIAGRAM STEP 2 Jan 18 11 8 42 9102...
Page 155: ...FIGURE 8C CC6 FOLDING DIAGRAM STEP 3 Jan 18 11 9102 8 43...
Page 156: ...FIGURE 8D CC6 FOLDING DIAGRAM STEP 4 Jan 18 11 8 44 9102...
Page 157: ...FIGURE 8E CC6 FOLDING DIAGRAM STEP 5 Jan 18 11 9102 8 45...
Page 158: ...FIGURE 8F CC6 FOLDING DIAGRAM STEP 6 Jan 18 11 8 46 9102...
Page 159: ...FIGURE 8G CC6 FOLDING DIAGRAM STEP 7 Jan 18 11 9102 8 47...
Page 160: ...FIGURE 8I CC6 FOLDING DIAGRAM STEP 9 Jan 18 11 8 48 9102...
Page 161: ...FIGURE 9 PLACEMENT OF RAFT IN VALISE Jan 18 11 9102 8 49...
Page 162: ...FIGURE 10 PAINTERLINE LOOPS FIGURE 11 ATTACHMENT OF CYLINDER NECK LOOP Jan 18 11 8 50 9102...
Page 163: ...FIGURE 12 ATTACHMENT OF CABLE LOOP Jan 18 11 9102 8 51...
Page 165: ...STORAGE 9 General 3 June 2 08 9102 9 1...
Page 166: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 9 2 9102...
Page 168: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 9 4 9102...
Page 169: ...TOOL EQUIPMENT AND MATERIALS May 29 13 9102 10 1 10 General 3 Tool List 5...
Page 170: ...June 2 08 10 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 172: ...June 2 08 10 4 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 176: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 11 2 9102...
Page 180: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 11 6 9102...
Page 182: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 11 8 9102...
Page 186: ...THIS PAGE INTENTIONALLY LEFT BLANK May 29 13 11 12 9102...
Page 188: ...FIGURE 1 LIFE RAFT ASSEMBLY Jan 18 11 11 14 9102...
Page 191: ...THIS PAGE INTENTIONALLY LEFT BLANK Jan 18 11 9102 11 17...
Page 192: ...FIGURE 2 HULL ASSEMBLY Jan 18 11 11 18 9102...
Page 194: ...FIGURE 3 CYLINDER VALVE ASSEMBLY Jan 18 11 11 20 9102...
Page 196: ...FIGURE 4 INFLATION VALVE ASSEMBLY M41115 Jan 18 11 11 22 9102...
Page 205: ...SPARE PARTS LIST 12 Introduction 3 Image List 5 Tool Image List 21 May 29 13 9102 12 1...
Page 206: ...THIS PAGE INTENTIONALLY LEFT BLANK May 29 13 12 2 9102...
Page 208: ...THIS PAGE INTENTIONALLY LEFT BLANK May 29 13 12 4 9102...
Page 218: ...THIS PAGE INTENTIONALLY LEFT BLANK May 29 13 12 14 9102...
Page 222: ...THIS PAGE INTENTIONALLY LEFT BLANK May 29 13 12 18 9102...
Page 224: ...THIS PAGE INTENTIONALLY LEFT BLANK Jan 18 11 9102 A 2...
Page 226: ......