TOOL LIST
May 29/13
9102
10 - 5
TOOL/EQUIPMENT/MATERIAL
PART NUMBER
SECTION 3 – DISASSEMBLY
A.
Wrench
B.
Diffuser Cap, -5
SECTION 4 – TESTING AND FAULT ISOLATION
A.
Manometer (0-10 psig))
B.
Thermometer (hang on manometer)
C.
Rubber Tubing (1/8in. x 3/8in. i/d x 1/2in. o/d)
(3m of 9mm i/d, 12mm o/d) for manometer connection
D.
Inflation Tool w/ Ball Valve, Quick-Connect End
E.
Deflation Tool, 3/8in. Hose Barb End
F.
Dry, oil free air supply of 5.6 to 7.0 kg/cm
2
(80 to 100 psig) regulated
to 140 g/cm2 (2.0 psig) for inflation purposes
G.
Solution of mild liquid soap and water (NOT detergent)
H.
Lint-free cloth, clean and dry
I.
Plug, PRV
J.
Barometer (+/- 0.1 in. Hg)
K.
Clock/Watch
SECTION 5 – CLEANING
A.
Mild Liquid Soap
B.
Mild Household Cleaner
C.
Lint-free cloth, clean and dry
SECTION 7 – REPAIR
A.
Raft Tube Fabric – Polyurethane, Yellow
B.
Steel Hand Roller
C.
Scissors
D.
Adhesive
E.
Methyl Ethyl Ketone (MEK)
F.
Lint-free fabric pad
G.
Lint-free cloth, clean and dry
---
95-301-017
---
---
---
95-41128-101
95-41129-101
---
---
---
95-301-014
---
---
---
---
---
10-302-001
80-338-003
---
95-306-004
---
---
---
Summary of Contents for 45-CC2V
Page 2: ......
Page 4: ...June 2 08 RR 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 10: ...June 2 08 SB 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 28: ......
Page 33: ...LIST OF ASSOCIATED PUBLICATIONS June 2 08 9102 AP 1 AP None Listed...
Page 34: ...June 2 08 AP 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 36: ...June 2 08 AB 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 38: ...June 2 08 TC 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 1 2 9102...
Page 44: ...June 2 08 2 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 50: ...FIGURE 2 VALISE June 2 08 2 8 9102...
Page 51: ...FIGURE 3 GAS INFLATION SYSTEM May 29 13 9102 2 9...
Page 54: ...FIGURE 4 RAFT DIMENSIONS Jan 18 11 2 12 9102...
Page 56: ...FIGURE 5 DEPLOYMENT Jan 18 11 2 14 9102...
Page 57: ...FIGURE 6 CANOPY ATTACHMENT Jan 18 11 9102 2 15...
Page 58: ...Jan 18 11 2 16 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 59: ...DISASSEMBLY 3 General 3 Procedures 5 June 2 08 9102 3 1...
Page 60: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 3 2 9102...
Page 62: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 3 4 9102...
Page 65: ...FIGURE 3 DISCONNECTING THE CYLINDER NECK LOOP Jan 18 11 9102 3 7...
Page 66: ...FIGURE 4 UNFOLD RAFT DISENGAGE THE CYLINDER Jan 18 11 3 8 9102...
Page 68: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 2 9102...
Page 70: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 4 9102...
Page 72: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 6 9102...
Page 74: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 8 9102...
Page 79: ...FIGURE 1 DIGITAL MANOMETER P N 95 41129 101 May 29 13 9102 4 13...
Page 85: ...CLEANING June 2 08 9102 5 1 5 General 3 Procedures 5 A Liferafts 5 B Valise 5...
Page 86: ...June 2 08 5 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 88: ...June 2 08 5 4 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 90: ...June 2 08 5 6 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 92: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 6 2 9102...
Page 94: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 6 4 9102...
Page 96: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 6 6 9102...
Page 98: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 6 8 9102...
Page 100: ...THIS PAGE IS INTENTIONALLY LEFT BLANK June 2 08 7 2 9102...
Page 102: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 7 4 9102...
Page 109: ...FIGURE 1 PATCHES AND TAPE APPLICATION June 2 08 9102 7 11...
Page 110: ...FIGURE 2 PATCH APPLICATION OVER SEAM May 29 13 7 12 9102...
Page 112: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 7 14 9102...
Page 114: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 8 2 9102...
Page 116: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 8 4 9102...
Page 119: ...FIGURE 2C FOLDING SEA ANCHOR FIGURE 2D PAINTERLINE PREPARATION Jan 18 11 9102 8 7...
Page 137: ...FIGURE 3 TOPPING OFF INFLATE DEFLATE VALVE FIGURE 4 ATTACHING THE CYLINDER June 2 08 9102 8 25...
Page 138: ...FIGURE 5 STORAGE OF COMPONENTS Jan 18 11 8 26 9102...
Page 140: ...FIGURE 6B CC2 FOLDING DIAGRAM STEP 2 June 2 08 8 28 9102...
Page 141: ...FIGURE 6C CC2 FOLDING DIAGRAM STEP 3 June 2 08 9102 8 29...
Page 142: ...FIGURE 6D CC2 FOLDING DIAGRAM STEP 4 D 53 25in June 2 08 8 30 9102...
Page 143: ...FIGURE 6E CC2 FOLDING DIAGRAM STEP 5 June 2 08 9102 8 31...
Page 144: ...FIGURE 6G CC2 FOLDING DIAGRAM CC4 STEP 7 June 2 08 8 32 9102...
Page 145: ...FIGURE 7A CC4 FOLDING DIAGRAM STEP 1 Jan 18 11 9102 8 33...
Page 146: ...FIGURE 7B CC4 FOLDING DIAGRAM STEP 2 Jan 18 11 8 34 9102...
Page 147: ...FIGURE 7C CC4 FOLDING DIAGRAM STEP 3 Jan 18 11 9102 8 35...
Page 148: ...FIGURE 7D CC4 FOLDING DIAGRAM STEP 4 Jan 18 11 8 36 9102...
Page 149: ...FIGURE 7E CC4 FOLDING DIAGRAM STEP 5 Jan 18 11 9102 8 37...
Page 150: ...FIGURE 7F CC4 FOLDING DIAGRAM STEP 6 D 71in Jan 18 11 8 38 9102...
Page 151: ...FIGURE 7G CC4 FOLDING DIAGRAM STEP 7 Jan 18 11 9102 8 39...
Page 152: ...FIGURE 7I CC4 FOLDING DIAGRAM STEP 9 Jan 18 11 8 40 9102...
Page 153: ...FIGURE 8A CC6 FOLDING DIAGRAM STEP 1 Jan 18 11 9102 8 41...
Page 154: ...FIGURE 8B CC6 FOLDING DIAGRAM STEP 2 Jan 18 11 8 42 9102...
Page 155: ...FIGURE 8C CC6 FOLDING DIAGRAM STEP 3 Jan 18 11 9102 8 43...
Page 156: ...FIGURE 8D CC6 FOLDING DIAGRAM STEP 4 Jan 18 11 8 44 9102...
Page 157: ...FIGURE 8E CC6 FOLDING DIAGRAM STEP 5 Jan 18 11 9102 8 45...
Page 158: ...FIGURE 8F CC6 FOLDING DIAGRAM STEP 6 Jan 18 11 8 46 9102...
Page 159: ...FIGURE 8G CC6 FOLDING DIAGRAM STEP 7 Jan 18 11 9102 8 47...
Page 160: ...FIGURE 8I CC6 FOLDING DIAGRAM STEP 9 Jan 18 11 8 48 9102...
Page 161: ...FIGURE 9 PLACEMENT OF RAFT IN VALISE Jan 18 11 9102 8 49...
Page 162: ...FIGURE 10 PAINTERLINE LOOPS FIGURE 11 ATTACHMENT OF CYLINDER NECK LOOP Jan 18 11 8 50 9102...
Page 163: ...FIGURE 12 ATTACHMENT OF CABLE LOOP Jan 18 11 9102 8 51...
Page 165: ...STORAGE 9 General 3 June 2 08 9102 9 1...
Page 166: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 9 2 9102...
Page 168: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 9 4 9102...
Page 169: ...TOOL EQUIPMENT AND MATERIALS May 29 13 9102 10 1 10 General 3 Tool List 5...
Page 170: ...June 2 08 10 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 172: ...June 2 08 10 4 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 176: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 11 2 9102...
Page 180: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 11 6 9102...
Page 182: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 11 8 9102...
Page 186: ...THIS PAGE INTENTIONALLY LEFT BLANK May 29 13 11 12 9102...
Page 188: ...FIGURE 1 LIFE RAFT ASSEMBLY Jan 18 11 11 14 9102...
Page 191: ...THIS PAGE INTENTIONALLY LEFT BLANK Jan 18 11 9102 11 17...
Page 192: ...FIGURE 2 HULL ASSEMBLY Jan 18 11 11 18 9102...
Page 194: ...FIGURE 3 CYLINDER VALVE ASSEMBLY Jan 18 11 11 20 9102...
Page 196: ...FIGURE 4 INFLATION VALVE ASSEMBLY M41115 Jan 18 11 11 22 9102...
Page 205: ...SPARE PARTS LIST 12 Introduction 3 Image List 5 Tool Image List 21 May 29 13 9102 12 1...
Page 206: ...THIS PAGE INTENTIONALLY LEFT BLANK May 29 13 12 2 9102...
Page 208: ...THIS PAGE INTENTIONALLY LEFT BLANK May 29 13 12 4 9102...
Page 218: ...THIS PAGE INTENTIONALLY LEFT BLANK May 29 13 12 14 9102...
Page 222: ...THIS PAGE INTENTIONALLY LEFT BLANK May 29 13 12 18 9102...
Page 224: ...THIS PAGE INTENTIONALLY LEFT BLANK Jan 18 11 9102 A 2...
Page 226: ......