OPERATION
Jan 18/11
9102
2 - 13
It is CRITICAL that the valise is not thrown overboard without FIRST having been secured to a strong
point on the ship or aircraft. If this instruction is not observed, the valise may be lost, and/or
personnel may be pulled overboard with it.
Caution: DO NOT attempt to unpack and inflate the liferaft on the deck of the vessel or
in the cabin of the aircraft; this may damage or puncture the liferaft. ALWAYS
insure that the liferaft is inflated in the water.
When the boat or aircraft is to be abandoned, carry the packed valise to the vessel’s side or aircraft
doorway selected for launching. Locate the end of the painterline, stowed under a flap on the side of
the valise. Secure the painterline to a strong point at the side of the craft, e.g., a handrail. (See
Figure 5)
With the painterline properly secured, throw the packed valise into the water. Grasp the painterline
and pull it continuously until all of the line is pulled from the pack. Finally give the line a series of
sharp jerks to initiate inflation. As inflation occurs, the force exerted by the inflating liferaft breaks
open the valise. When inflation is complete, the liferaft is ready for boarding. Full inflation is achieved
in 30 to 60 seconds.
In the rare event that the liferaft should inflate upside down, it can be righted by a survivor in the
water. The Coastal Compact 4 & 6 person has a righting handle fitted to the underside of the floor for
additional assistance.
The floating knife stowed in a compartment on the buoyancy tube is used when it becomes necessary
to sever the painterline and free the liferaft from the abandoned ship.
As the buoyancy of the liferaft is greater than the strength of the painterline, there is no danger of the
liferaft be dragged down if the abandoned boat or aircraft quickly sinks. The line will break, allowing
the liferaft to float freely on the surface.
On rafts with an optional canopy, a canopy kit bag is packed inside the raft valise and tethered to the
life raft buoyancy tube. After inflating and boarding the raft, retrieve the canopy kit bag from the
water. The kit bag contains the orange canopy fabric and yellow inflatable arch support tube. Orally
inflate the arch tube and connect to the raft. Then attach the canopy fabric and erect using the arch
tube. (See Figure 6)
Summary of Contents for 45-CC2V
Page 2: ......
Page 4: ...June 2 08 RR 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 10: ...June 2 08 SB 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 28: ......
Page 33: ...LIST OF ASSOCIATED PUBLICATIONS June 2 08 9102 AP 1 AP None Listed...
Page 34: ...June 2 08 AP 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 36: ...June 2 08 AB 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 38: ...June 2 08 TC 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 1 2 9102...
Page 44: ...June 2 08 2 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 50: ...FIGURE 2 VALISE June 2 08 2 8 9102...
Page 51: ...FIGURE 3 GAS INFLATION SYSTEM May 29 13 9102 2 9...
Page 54: ...FIGURE 4 RAFT DIMENSIONS Jan 18 11 2 12 9102...
Page 56: ...FIGURE 5 DEPLOYMENT Jan 18 11 2 14 9102...
Page 57: ...FIGURE 6 CANOPY ATTACHMENT Jan 18 11 9102 2 15...
Page 58: ...Jan 18 11 2 16 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 59: ...DISASSEMBLY 3 General 3 Procedures 5 June 2 08 9102 3 1...
Page 60: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 3 2 9102...
Page 62: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 3 4 9102...
Page 65: ...FIGURE 3 DISCONNECTING THE CYLINDER NECK LOOP Jan 18 11 9102 3 7...
Page 66: ...FIGURE 4 UNFOLD RAFT DISENGAGE THE CYLINDER Jan 18 11 3 8 9102...
Page 68: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 2 9102...
Page 70: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 4 9102...
Page 72: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 6 9102...
Page 74: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 8 9102...
Page 79: ...FIGURE 1 DIGITAL MANOMETER P N 95 41129 101 May 29 13 9102 4 13...
Page 85: ...CLEANING June 2 08 9102 5 1 5 General 3 Procedures 5 A Liferafts 5 B Valise 5...
Page 86: ...June 2 08 5 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 88: ...June 2 08 5 4 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 90: ...June 2 08 5 6 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 92: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 6 2 9102...
Page 94: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 6 4 9102...
Page 96: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 6 6 9102...
Page 98: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 6 8 9102...
Page 100: ...THIS PAGE IS INTENTIONALLY LEFT BLANK June 2 08 7 2 9102...
Page 102: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 7 4 9102...
Page 109: ...FIGURE 1 PATCHES AND TAPE APPLICATION June 2 08 9102 7 11...
Page 110: ...FIGURE 2 PATCH APPLICATION OVER SEAM May 29 13 7 12 9102...
Page 112: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 7 14 9102...
Page 114: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 8 2 9102...
Page 116: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 8 4 9102...
Page 119: ...FIGURE 2C FOLDING SEA ANCHOR FIGURE 2D PAINTERLINE PREPARATION Jan 18 11 9102 8 7...
Page 137: ...FIGURE 3 TOPPING OFF INFLATE DEFLATE VALVE FIGURE 4 ATTACHING THE CYLINDER June 2 08 9102 8 25...
Page 138: ...FIGURE 5 STORAGE OF COMPONENTS Jan 18 11 8 26 9102...
Page 140: ...FIGURE 6B CC2 FOLDING DIAGRAM STEP 2 June 2 08 8 28 9102...
Page 141: ...FIGURE 6C CC2 FOLDING DIAGRAM STEP 3 June 2 08 9102 8 29...
Page 142: ...FIGURE 6D CC2 FOLDING DIAGRAM STEP 4 D 53 25in June 2 08 8 30 9102...
Page 143: ...FIGURE 6E CC2 FOLDING DIAGRAM STEP 5 June 2 08 9102 8 31...
Page 144: ...FIGURE 6G CC2 FOLDING DIAGRAM CC4 STEP 7 June 2 08 8 32 9102...
Page 145: ...FIGURE 7A CC4 FOLDING DIAGRAM STEP 1 Jan 18 11 9102 8 33...
Page 146: ...FIGURE 7B CC4 FOLDING DIAGRAM STEP 2 Jan 18 11 8 34 9102...
Page 147: ...FIGURE 7C CC4 FOLDING DIAGRAM STEP 3 Jan 18 11 9102 8 35...
Page 148: ...FIGURE 7D CC4 FOLDING DIAGRAM STEP 4 Jan 18 11 8 36 9102...
Page 149: ...FIGURE 7E CC4 FOLDING DIAGRAM STEP 5 Jan 18 11 9102 8 37...
Page 150: ...FIGURE 7F CC4 FOLDING DIAGRAM STEP 6 D 71in Jan 18 11 8 38 9102...
Page 151: ...FIGURE 7G CC4 FOLDING DIAGRAM STEP 7 Jan 18 11 9102 8 39...
Page 152: ...FIGURE 7I CC4 FOLDING DIAGRAM STEP 9 Jan 18 11 8 40 9102...
Page 153: ...FIGURE 8A CC6 FOLDING DIAGRAM STEP 1 Jan 18 11 9102 8 41...
Page 154: ...FIGURE 8B CC6 FOLDING DIAGRAM STEP 2 Jan 18 11 8 42 9102...
Page 155: ...FIGURE 8C CC6 FOLDING DIAGRAM STEP 3 Jan 18 11 9102 8 43...
Page 156: ...FIGURE 8D CC6 FOLDING DIAGRAM STEP 4 Jan 18 11 8 44 9102...
Page 157: ...FIGURE 8E CC6 FOLDING DIAGRAM STEP 5 Jan 18 11 9102 8 45...
Page 158: ...FIGURE 8F CC6 FOLDING DIAGRAM STEP 6 Jan 18 11 8 46 9102...
Page 159: ...FIGURE 8G CC6 FOLDING DIAGRAM STEP 7 Jan 18 11 9102 8 47...
Page 160: ...FIGURE 8I CC6 FOLDING DIAGRAM STEP 9 Jan 18 11 8 48 9102...
Page 161: ...FIGURE 9 PLACEMENT OF RAFT IN VALISE Jan 18 11 9102 8 49...
Page 162: ...FIGURE 10 PAINTERLINE LOOPS FIGURE 11 ATTACHMENT OF CYLINDER NECK LOOP Jan 18 11 8 50 9102...
Page 163: ...FIGURE 12 ATTACHMENT OF CABLE LOOP Jan 18 11 9102 8 51...
Page 165: ...STORAGE 9 General 3 June 2 08 9102 9 1...
Page 166: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 9 2 9102...
Page 168: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 9 4 9102...
Page 169: ...TOOL EQUIPMENT AND MATERIALS May 29 13 9102 10 1 10 General 3 Tool List 5...
Page 170: ...June 2 08 10 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 172: ...June 2 08 10 4 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 176: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 11 2 9102...
Page 180: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 11 6 9102...
Page 182: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 11 8 9102...
Page 186: ...THIS PAGE INTENTIONALLY LEFT BLANK May 29 13 11 12 9102...
Page 188: ...FIGURE 1 LIFE RAFT ASSEMBLY Jan 18 11 11 14 9102...
Page 191: ...THIS PAGE INTENTIONALLY LEFT BLANK Jan 18 11 9102 11 17...
Page 192: ...FIGURE 2 HULL ASSEMBLY Jan 18 11 11 18 9102...
Page 194: ...FIGURE 3 CYLINDER VALVE ASSEMBLY Jan 18 11 11 20 9102...
Page 196: ...FIGURE 4 INFLATION VALVE ASSEMBLY M41115 Jan 18 11 11 22 9102...
Page 205: ...SPARE PARTS LIST 12 Introduction 3 Image List 5 Tool Image List 21 May 29 13 9102 12 1...
Page 206: ...THIS PAGE INTENTIONALLY LEFT BLANK May 29 13 12 2 9102...
Page 208: ...THIS PAGE INTENTIONALLY LEFT BLANK May 29 13 12 4 9102...
Page 218: ...THIS PAGE INTENTIONALLY LEFT BLANK May 29 13 12 14 9102...
Page 222: ...THIS PAGE INTENTIONALLY LEFT BLANK May 29 13 12 18 9102...
Page 224: ...THIS PAGE INTENTIONALLY LEFT BLANK Jan 18 11 9102 A 2...
Page 226: ......