Contents
2
—
English
Vacuum spray degassing
—
18.12.2019
–
Rev. A
English
Contents
Notes on the operating manual............................. 3
Liability and guarantee................................ ....... 3
Safety ................................ ........................... 3
Explanation of symbols ................................................................... 3
Personnel requirements.................................................................. 3
Personal protective equipment .................................................... 3
Inadmissible operating conditions .............................................. 3
Description of the device ................................ .... 4
Scope of delivery ............................................................................... 6
Optional equipment and accessories.......................................... 6
Technical data ................................ ................. 6
Electrical system ................................................................................ 6
Dimensions and connections ........................................................ 6
Installation ................................ ..................... 7
Incoming inspection......................................................................... 7
Preparatory work............................................................................... 7
Fitting the add-on components ......................................... 8
Installation location ............................................................... 8
Hydraulic connection............................................................. 8
Switching and make-up variants.................................................. 9
Pressure-dependent "Magcontrol" make-up mode..... 9
Level dependent "Levelcontrol" make-up mode.......... 9
Electrical connection ........................................................................ 9
Terminal diagram .................................................................10
RS-485 interface....................................................................10
Installation and commissioning certificate .............................11
Commissioning ................................ .............. 11
Checking the requirements for commissioning.....................11
Setting the minimum operating pressure for Magcontrol .11
Operator panel...................................................................... 11
Modifying the controller's start routine................................... 12
Filling the device with water and venting .............................. 12
Vacuum test...................................................................................... 13
Use the device to fill the facility system with water............. 13
Parametrising the controller in the Customer menu ........... 13
Starting Automatic mode............................................................. 15
Operation ................................ .................... 15
Operating modes............................................................................ 15
Automatic mode................................................................... 15
Manual mode ........................................................................ 16
Stop mode.............................................................................. 16
Summer operation............................................................... 16
Restarting ............................................................................... 16
Customer menu .................................................................... 16
Service menu ......................................................................... 16
Default settings..................................................................... 16
Messages ................................................................................ 17
Maintenance ................................ ................ 18
Exterior leak test ............................................................................. 19
Cleaning the dirt trap .................................................................... 19
Inspecting system degassing and make-up degassing....... 19
Maintenance certificate ................................................................ 19
Pressure-bearing components......................................... 19
Inspection prior to commissioning................................. 19
Inspection intervals ............................................................. 20
Disassembly ................................ ................. 20
Annex................................ ......................... 20
Reflex Customer Service ............................................................... 20
Conformity and standards ........................................................... 20
Vacuum spray degassing
18.12.2019
–
Rev. A
Summary of Contents for Servitec 35
Page 21: ......