INSTALLATION
Figure 3
1. Locate both hanger brackets included in the kit (item 2, figure 1). Install U-bolt and chain from your Weight Distribution Kit
on each hanger bracket as shown in figure 3 (if installing Dual Cam HP on an existing weight distribution kit, the U-bolts and
chains will need to be removed from each spring bar before they can be installed on the hanger brackets).
The U-bolts must be installed in the ends of the chains (last link) as shown in figure 3.
Installation Instructions
REESE Dual Cam HP
High-Performance Sway Control
2. Install 2 lock nuts per U-bolt, tighten u-bolt nuts. Make sure at least 2 threads are showing past the ends of the nuts.
4. Position the adjustment nut and locking nut to the outermost positions as shown in figure 5. If the
adjustment is difficult, as the adjustment nut must be turned by hand, apply a small amount of light penetrating oil such as
WD40 or PB Blast to the threads of the cam arm. Work the adjustment nut back or forward to get the penetrating oil into the
threads until the adjustment nut moves freely to the desired position.
3. Using a grease pencil or suitable marking device such as a marker and a straight edge locate and mark the center of the hitch
ball on the coupler both horizontally and vertically as shown in figure 4 . This reference point will be used to locate the cam
arm assembly position. Mark both sides of the coupler.
Figure 4
Figure 5