Step 8: Customer Handover
Before handing the system over to the customer ensure the following items are completed,
1.
If a 2-wire auto-start generator is connected, ensure that it can be started by the
HoneyBadger. Also ensure the supplied Victron battery charger is connected to the generator
starter battery.
2.
The system is correctly earthed, either via the customer’s local earth or through a locally
installed earth stake.
3.
A MEN link is installed as required.
4.
The PV cables are connected via in-line string fusing and MC4 branch connectors, for each
MPPT, and the polarity is correct. The parts kit includes 16 in-line fuses suitable for 8 strings
of panels.
5.
The battery and DC terminal connections are tight. (Check during installation)
6.
Insert the supplied blanking plugs into the unused holes in the side of the unit and reinstall
the side vents.
Handover to customer
1.
Confirm that the customer has scanned the QR code and entered their information, including
an email address. Have the customer download RedEarth’s EMU App. They will be able to
register their system an begin monitoring it immediately in the app. Otherwise, provide the
customer’s contact details to RedEarth to complete onboarding the customer at a later time.
2.
Explain to the customer how the system operates and demonstrate the operation of the
generator auto-start.
3.
Also demonstrate the operation and effect of the By-pass switch, which runs all loads from
the generator.
4.
Obtain any customer signatures required for claiming STC’s
Finally, provide the required documentation to RedEarth. This also ensures the full RedEarth warranty