HoneyBadger Installation Manual
HoneyBadger Install Version 2
Page 15 of 32
Issue Date 18/07/2022
4.1
Solar
Connect the PV arrays to the breakers shown
at right. If two MPPTs are present, then there
will be two sets of breakers as shown.
Ensure that the polarity is correct. You can
identify this by looking at the colour of the
cables connected to the bottom of the
breakers.
Note that the PV array must always be wired
in a way that maintains the voltage below
250V
DC
.
4.2
AC Connections
AC cables should be inserted through the existing holes on either the left or right of the system, then
sealed appropriately with 25mm or 32mm glands and conduit. The Appendix A contains a SLD for the
system wiring.
The AC wiring can be more easily completed by removing the vent on the left side of the HoneyBadger
as shown below.
4.2.1 Load connection
The active cable is connected to the bottom side of the unit’s
main breaker identified as “Inverter OUT”. Neutral and Earth
cables are connected to their respective busbars.
NOTE: The LOAD connection should come from a Switch
Board which contains a MEN link and a suitable earth as
required for the premises.
NOTE: Caution, while installing the Active cable ensure that the other smaller cable connected to the
same breaker remains in place.