
54
INJECTOR AND PILOT REMOVAL INSTRUCTIONS
(continued)
18. Loosen aeration cap screw approx. ½ turn.
Rotate cap until the correct gap is achieved to suit the gas
type.
The listed opening is required on each side of the aeration
cap.
(A ruler or similar can be used to check the opening, a drill bit
of the designated size can also be inserted to check the
opening) Tighten screw to retain aeration cap setting
Aeration Settings - See Media chart
19. Refit injector assembly into aeration cap.
20. Refit gas pipe and tighten nuts.
21. Ensure injector assembly is sitting firmly into aeration cap
and tighten grub screw.
NOTE – ENSURE INJECTOR ASEMBLY IS AIMING
CENTRALLY INTO THE AERATION CAP AND TUBE.
Correct where required.
22. Rotate burner to check insulation is correctly located.
The burner consists of two types of insulation. In the event
the lower insulation (white glass wool blanket) has moved
push firmly down and ensure blanket fills all gaps and
corners of the burner.
23. Sit 12mm hard insulation back into burner. Hard insulation
should sit loosely onto the top of soft insulation
approximately level with the burner. Where required adjust
the soft insulation to ensure sitting correctly.
TAKE CARE – where the burner has been previously used
the hard insulation is easily cracked.
The insulation media can be repainted using an approved
high temperature paint, contact Real Flame for details.
Summary of Contents for ELEMENT 1800 DOUBLE SIDED
Page 9: ...9 ELEMENT DS1800 FLUE TERMINATION COWLS...
Page 14: ...14 Fit front cover INSTALLATION INSTRUCTIONS continued...
Page 37: ...37 4 glass insert panels Locate between pins...
Page 51: ...51...
Page 59: ...59...