
12
Cut flue exhaust tube (hot tube) to length
(Approximately flush with wall exit).
Connection plate will sit against wall.
Cut Air intake flue.
Ensure ends are burr free and round, test fit flue will
slide over connection.
Pull flue through approx. 100mm (will be pushed back
once terminal is fitted).
Feed power cable through wall and into wall terminal.
Feed power cable through wall and into wall terminal.
INSTALLATION INSTRUCTIONS
(continued)
Apply an 8mm silicon bead fully around the inside of
the flue end (heater connection end)
Fit flue clamp over flue (loosely).
Summary of Contents for ELEMENT 1800 DOUBLE SIDED
Page 9: ...9 ELEMENT DS1800 FLUE TERMINATION COWLS...
Page 14: ...14 Fit front cover INSTALLATION INSTRUCTIONS continued...
Page 37: ...37 4 glass insert panels Locate between pins...
Page 51: ...51...
Page 59: ...59...