
24
INSTALLATION INSTRUCTIONS
(continued)
Connect hot exhaust flue and air intake flue as per
below.
Apply an 8mm silicon bead fully around the inside of
the flue end.
Fit flue clamp over flue (loosely).
Slide flue onto connection spigot fully.
Tighten clamp fully.
Wipe excess silicon, visually check connection to
ensure connection is fully sealed.
Fit roof sealing method (Decktite or similar).
IMPORTANT
- Apply silicon bead between inner
connection of cowl and flue pipe to seal inner flue to
cowl. Outer does not require sealing.
Screw or rivet in 3 places to hold in place.
Ensure flue is supported and clipped where required.
Summary of Contents for ELEMENT 1800 DOUBLE SIDED
Page 9: ...9 ELEMENT DS1800 FLUE TERMINATION COWLS...
Page 14: ...14 Fit front cover INSTALLATION INSTRUCTIONS continued...
Page 37: ...37 4 glass insert panels Locate between pins...
Page 51: ...51...
Page 59: ...59...