JOINTLY DEVELOPED WITH
WWW.RC-WARBIRDS.COM
Page 2/16
Items required to complete the retract kit installation:
•
30
min
epoxy
•
Milled
fiberglass
•
Drill (e.g. Dremel tool) with 1, 1.5 and 2mm drill
•
X-acto
Knife
•
Sandpaper
(220-180)
•
1x HET-RC 9gram Servo (switched retract valve)
•
1x Feather servo with at least 1.8kg torque (example: Hitec HS-65HB)
(nose gear steering)
A rotary tool such as a Dremel will greatly help in the building process.
A drum sander and cutting disk is highly recommended to cut the necessary
retract openings into the fiberglass fuselage.
Please note:
Due to the higher take-off weight of the MiG-29 with installed retracts we highly
recommend a setup with at least 2x Typhoon 2W-20 Motors, suitable ESC and
LiPo battery. We further recommend the use of a concrete runway to reduce
stress on the landing gear.