26
RBCBioscience
Before testing the heater, please add 500μl water
into the heat block well 1 (as shown by the arrow)
of the cartridge, and then put the cartridge into
the cartridge rack and put the thermometer in the
water.
Please select the Heater Test button.
Please select the Yes button to start the test.
Now the heater will be heated up to 60° C, please
check whether the temperature shown on the
thermometer is consistent with that shown on the
screen.
The acceptable temperature range is 60± 5° C.
Please put the cuvette in the attachment pack into
the cartridge rack before the optic test without any
liquid or 200μl SP tip.
Please refer to the Install MagCore® Cuvette
chapter.
Please select the Optic Test button.
Please select the Empty Cuvette and then wait for
15 minutes to perform the test.
The test may take some time to wait the D2 lamp
prewarm. The screen will show the measured
values after the test is finished. You can insert the
USB Flash Drive and then press the Save button
to store the current data after the USB icon shows
in the status bar. Please take out the USB Flash
Drive and then you can perform other operations
after the icon of USB Flash Drive disappears. The
acceptable range of the count value >7000
━ Heater Test
━ Optic Test
Maintenance
Reject Tip
Piston Test
UV
Heater Test
Replace O-Ring
Motor Test
Next
Back
Start Heater Test ?
Yes
Heater Test
No
Start Heater Test ?
Save
Empty Cuvette
Back
Back
Heater Test
Stop
Heating
50°C / 80°F
O2 Lamp OFF
When installing it, please do not scratch the optic test window.
Prev
Maintenance
Update Program
Vender
Piercing Needles
System Status
Optic Test
Alarm History
Back
Prev
Maintenance
Empty Cuvette
Reference
Back
Please save the data in the USB Flash Drive
in a personal computer, or the data in the
USB Flash Drive may be overwritten later.
File name: OpticalCuvetteCount.cvs
(MagCore Super Only)
Summary of Contents for MagCore HF16 Plus
Page 1: ...MagCore Super HF16Plus EngineerInTraining manual ...
Page 34: ...33 Disassemble thebackservicelid Disassemble back service lid ...
Page 35: ...34 RBCBioscience Disassemblethe topservicelid Po ...
Page 63: ...62 RBCBioscience Maintenance Electricalcontrolandengineeringsoftware ...
Page 66: ...65 Mainboardconfiguration ...
Page 75: ...74 RBCBioscience PositionTeachingTools 200µlSPTip toolA toolB toolC PipetteTip ...
Page 87: ...86 RBCBioscience ...
Page 93: ...92 RBCBioscience ...
Page 94: ......
Page 95: ......