3.1 Installation checklist
Installation includes the following activities:
Installation Task
1
Plan your system.
2
Obtain all required equipment and tools.
3
Site all equipment.
4
Route all cables.
5
Drill cable and mounting holes.
6
Make all connections into equipment.
7
Secure all equipment in place.
8
Power on and test the system.
Schematic diagram
A schematic diagram is an essential part of planning
any installation. It is also useful for any future
additions or maintenance of the system. The
diagram should include:
• Location of all components.
• Connectors, cable types, routes and lengths.
3.2 Parts supplied – Ray50
The parts listed below are supplied with the
Ray50
D13231-1
1
8
9
7
1
0
1
1
1
2
4
5
6
3
2
x
4
x 4
x 2
Item
Description
1
Ray50
with Fistmic
2
Sun cover
3
Panel mount gasket
4
Mounting bracket
5
Mounting bracket knobs
6
Fistmic mounting clip
7
4 x Mounting bracket fixings
8
Documentation
9
4 x Panel mount fixings comprising: (nut,
bolt and locking washer)
10
Protective antenna boot
11
2 x Fistmic mounting clip fixings
12
SeaTalk
ng®
400 mm (15.7 in.) spur cable
16
Ray50 / Ray60 / Ray70
Summary of Contents for RAY50
Page 2: ......
Page 4: ......
Page 14: ...14 Ray50 Ray60 Ray70...
Page 26: ...26 Ray50 Ray60 Ray70...
Page 74: ...74 Ray50 Ray60 Ray70...
Page 78: ...78 Ray50 Ray60 Ray70...
Page 82: ...82 Ray50 Ray60 Ray70...
Page 92: ...92 Ray50 Ray60 Ray70...
Page 98: ...98 Ray50 Ray60 Ray70...
Page 102: ...102 Ray50 Ray60 Ray70...
Page 115: ......
Page 116: ...www raymarine com...