RCMDC-6627-PF-48
INSTALL INSTRUCTIONS
www.raycap.com
©Raycap • All rights reserved
320-1204 Rev.E
Page 8 of 38
Cable Installation Instructions
7.1
At the base of the OVP boxes there are cable glands
that provide weatherproofing for the enclosure.
The following steps will show how to install the
Hybrid cable properly.
7.2
Remove compression nut.
7.3
Remove center insert from cable gland.
7.4
Slide compression nut and insert over
the cable breakout. Be careful not to
damage the fiber connectors. Insert
needs to be 1" behind heat shrink tube.
7.5
Carefully feed fiber and power
conductors into the OVP box and
tighten the compression nut.
Torque:
approximately 44 in-lbs