Maintenance and repair
183
C
AXIS
50.2
Please follow the following instructions for folding out steps.
C.2.3
Folding in the steps
Before every trip and during spreading operation:
Fold in the steps.
1.
Lift the steps up at the bot-
tom and fold them out.
2.
Securely lock the steps into
open position.
Figure 15:
Folding out the steps
1.
Lift the steps up at the bot-
tom and fold them inwards.
2.
Securely lock the steps into
closed position.
Figure 16:
Folding in the steps in closed
position
K
D
C
Q
W
R
Summary of Contents for AXIS-M 20.2 EMC
Page 4: ......
Page 12: ...Table of Contents VIII ...
Page 44: ...Safety 3 24 AXIS AXIS ...
Page 51: ...Technical data 31 4 AXIS AXIS 4 2 4 Agitator Figure 4 6 Agitator 1 Metering slide 2 Agitator ...
Page 64: ...Axle load calculation 5 44 AXIS AXIS ...
Page 66: ...Transportation without tractor 6 46 AXIS AXIS ...
Page 68: ...Instructions regarding the spreading operation 7 48 AXIS AXIS ...
Page 110: ...General commissioning all machine types 8 90 AXIS AXIS ...
Page 144: ...Maintenance and repair C 124 AXIS AXIS 20 2 ...
Page 178: ...Maintenance and repair C 158 AXIS AXIS 30 1 AXIS 40 1 ...
Page 214: ...Maintenance and repair C 194 AXIS AXIS 50 2 ...
Page 236: ......