Spreading operation
B
108
AXIS
A
X
IS
20.
2
B.6.2
Implementing the calibration
Requirements:
The metering slides are closed.
PTO and tractor engine are switched off and locked to prevent unauthorised
starting.
An adequately sized container is ready for collecting the fertiliser (minimum
capacity
25 kg
).
-
Determine the empty weight of the collecting vessel.
Prepare the calibration test chute. The calibration test chute is located in the
centre behind the spreading disc guard.
A sufficient quantity of fertiliser is placed in the hopper.
Using the fertiliser chart, the pre-set values for the metering slide end stop,
the PTO speed and the calibration test time are determined and known.
n
WARNING
Risk of injury due to chemicals
Escaping fertiliser may lead to injury to eyes and nasal mucous
membrane.
Wear safety goggles during the calibration.
Before running the calibration test, ensure that all people
leave the hazard zone of the machine.
NOTICE
Select the values for the calibration test for the maximum possible spreading
rate. The greater the quantity, the greater the precision of the measurement.
[1] Position of the calibration test
chute
Figure 16:
Calibration test chute
1
K
D
R
C
Q
W
EMC
Summary of Contents for AXIS-M 20.2 EMC
Page 4: ......
Page 12: ...Table of Contents VIII ...
Page 44: ...Safety 3 24 AXIS AXIS ...
Page 51: ...Technical data 31 4 AXIS AXIS 4 2 4 Agitator Figure 4 6 Agitator 1 Metering slide 2 Agitator ...
Page 64: ...Axle load calculation 5 44 AXIS AXIS ...
Page 66: ...Transportation without tractor 6 46 AXIS AXIS ...
Page 68: ...Instructions regarding the spreading operation 7 48 AXIS AXIS ...
Page 110: ...General commissioning all machine types 8 90 AXIS AXIS ...
Page 144: ...Maintenance and repair C 124 AXIS AXIS 20 2 ...
Page 178: ...Maintenance and repair C 158 AXIS AXIS 30 1 AXIS 40 1 ...
Page 214: ...Maintenance and repair C 194 AXIS AXIS 50 2 ...
Page 236: ......