General commissioning (all machine types)
49
8
AXISAXIS
8
General commissioning (all machine types)
8.1
Accepting the machine
When accepting the machine, please check the completeness of the delivery.
The standard equipment includes:
1 mineral fertiliser spreader of the AXIS series,
1 operator’s manual AXIS 20.2, AXIS 30.2, AXIS 40.2, AXIS 50.2
1 fertiliser chart (on paper or CD)
1 calibration kit comprising chute and calculator
Lower link and upper link pins
1 spreading disc set (according to order)
1 universal drive shaft (including operator’s manual)
1 agitator
Protective grids in hopper
Version Q or W: QUANTRON-A operating unit
AXIS 30.2 W ISOBUS, AXIS 40.2 W ISOBUS, AXIS 50.2 W ISOBUS: ISO-
BUS machine control unit
Version C: Operating unit E-CLICK
AXIS 20.2/30.2/40.2 EMC (+ W): QUANTRON-E2 M EMC operating unit
Please also check any optional equipment that you ordered.
Check for any shipping damage or missing parts. Any shipping damage must be
confirmed by the shipping agent.
If in doubt, contact your salesperson or the manufacturer directly.
NOTICE
When receiving the machine, check that all attached components are correctly
and tightly seated.
The right-hand spreading disc and left-hand spreading disc must be mounted
facing the direction of travel.
Summary of Contents for AXIS-M 20.2 EMC
Page 4: ......
Page 12: ...Table of Contents VIII ...
Page 44: ...Safety 3 24 AXIS AXIS ...
Page 51: ...Technical data 31 4 AXIS AXIS 4 2 4 Agitator Figure 4 6 Agitator 1 Metering slide 2 Agitator ...
Page 64: ...Axle load calculation 5 44 AXIS AXIS ...
Page 66: ...Transportation without tractor 6 46 AXIS AXIS ...
Page 68: ...Instructions regarding the spreading operation 7 48 AXIS AXIS ...
Page 110: ...General commissioning all machine types 8 90 AXIS AXIS ...
Page 144: ...Maintenance and repair C 124 AXIS AXIS 20 2 ...
Page 178: ...Maintenance and repair C 158 AXIS AXIS 30 1 AXIS 40 1 ...
Page 214: ...Maintenance and repair C 194 AXIS AXIS 50 2 ...
Page 236: ......