The insulation should be left in a warmer room for a longer period
of time before it is in a warmer room for a longer period of time
before installation to make it easier to fit.
Unpack the insulation and check for damage and completeness as
per the according to the enclosed parts list.
Align the storage tank with a spirit level.
The following insulation steps can also be carried out after installa
-
tion.
However, it may be somewhat more difficult due to the pipework
and possibly narrow space conditions in the boiler room.
Insert the floor segments at the bottom.
Remove the foot rim panels from the insulation segment.
(Velcro fastener).
Set up the front and rear insulation segments.
Carefully guide the storage tank connections at the bottom
through the through the fleece openings.
At least 2 people are needed for this.
ASSEMBLY
STORAGE TANK INSULATION
Summary of Contents for Oskar-10
Page 1: ...Technical file Oskar 10...