15
RAM 100 • 1000 • 5500
RAMSET
www.ramsetinc.com
PRIMARY/SECONDARY INSTALLATION
(RH) Right Hand operation requires Dip Switch
(A4) "Left/Right" to be ON.
Dip Switch “A”
Use 3-stranded, shielded wires
(not supplied) from Primary to Secondary.
Route low-voltage wires for Primary/Secondary
in a conduit separate from power.
Three pushbuttons are located under the dip switches for operation of the gate (see Figure 15). The opening, stop and
closing buttons can be utilized to set limit switches and verify proper system operation when installing or servicing an
operator.
Opening
Opens the gate.
Stop
Stops the gate.
Closing
Closes the Gate.
RESETTING THE E.R.D. (Electronic Reversing
Device)
With power ‘on’ push all three pushbuttons for
approximately 5 seconds. All three LEDs should
blink. Once they start blinking, let go of the three
pushbuttons.
PUSHBUTTON CONTROLS
Figure 16
“Intelligate” Control Board
L.E.D.’s light up when Opening,
Closing or Stopped
Figure 15
When pushing the three buttons, the gate can move at any time. Always keep body parts and
clothing clear of pulleys, sprockets and all moving and electrical components in the operator
to help prevent serious injury.
WARNING