
LOAD LEVELING SYSTEM — IF EQUIPPED
The automatic load leveling system will provide a level-
riding vehicle under most passenger and cargo loading
conditions.
A hydraulic pump contained within the shock absorbers
raises the rear of the vehicle to the correct height. It takes
approximately 1 mile (1.6 km) of driving for the leveling
to complete depending on road surface conditions.
If the leveled vehicle is not moved for approximately 15
hours, the leveling system will bleed itself down. The
vehicle must be driven to reset the system.
ROOF LUGGAGE RACK — IF EQUIPPED
The crossbars on your vehicle are delivered stowed
within the roof rack side rails. If adding cargo, deploy the
crossbars. Distribute cargo weight evenly on the roof rack
crossbars, to maximum of 150 lbs (68 kg). The roof rack
does not increase the total load carrying capacity of the
vehicle. Be sure the total load of cargo inside the vehicle
plus that on the external rack does not exceed the
maximum vehicle load capacity.
298
UNDERSTANDING THE FEATURES OF YOUR VEHICLE
Summary of Contents for 2013 Cargo Van
Page 4: ......
Page 7: ...1 INTRODUCTION 5...
Page 173: ...3 UNDERSTANDING THE FEATURES OF YOUR VEHICLE 171...
Page 174: ...172 UNDERSTANDING THE FEATURES OF YOUR VEHICLE...
Page 175: ...3 UNDERSTANDING THE FEATURES OF YOUR VEHICLE 173...
Page 245: ...Fast Tone Continuous Tone 3 UNDERSTANDING THE FEATURES OF YOUR VEHICLE 243...
Page 315: ...INSTRUMENT CLUSTER BASE 4 UNDERSTANDING YOUR INSTRUMENT PANEL 313...
Page 316: ...INSTRUMENT CLUSTER PREMIUM 314 UNDERSTANDING YOUR INSTRUMENT PANEL...
Page 462: ...Operating Tips Chart 460 UNDERSTANDING YOUR INSTRUMENT PANEL...
Page 515: ...5 STARTING AND OPERATING 513...
Page 570: ......
Page 604: ......
Page 660: ......
Page 668: ......
Page 679: ...INDEX 10...
Page 700: ......