15
a=220mm; b=80mm; c=23mm; d=560mm
5. Boiler hydraulic scheme
Heat pipes should be connected in the following manner
:
- Connect the cold water connection to the connection 8, picture 3.
- Connect the hot water connection to the connection 9, picture 3.
Filling the boiler with heating water and testing welded joints and tightness:
Testing tightness should be carried out before commissioning the boiler.
DANGER:
Injuries and/or material damage may be caused by exceeding pressure
during testing tightness!
High pressure may damage regulation and safety devices, as well as the cylinder
itself.
Fill the boiler up to the pressure that corresponds to the opening pressure of
safety valve.
Comply fully to the pressure of built-in components.
After testing the tightness, open the valves again.
Check whether all pressure regulators and installation safety elements work
properly
Picture 5. Position of screw anchors for assembly