1) Open inlet valve. Ensure water in the inlet pipe and check if the pipe is leakage
or clogged.
2) Switch on electric leakage breaker in electric block to serve the machine. To
ensure the line voltage of phase AB = 210~240VAC and grounded reliable.
3) Place spout case and protectective cover in position, insert overflow pipe, put the
cover on.
4) Switch the power button to “ON” position (filling water now).
5) When water reach the down level, heating up will start automatically. When
water reaches up level, stop filling water automatically.
6) Press each down button, corresponding lifters will down automatically and start
blending (water boiling in machine sink). When the setting time countdown over
(factory settings time is 3s), lifters automatic move to the up position and stop, and
the blend is stopped as well.
7) After everything is confirmed and is normal, switch the power button to “OFF”.
Clean the machine (water sink inside, spout case, thermal sensor, cover, impeller,
hold ring, noodle baskets, float, protect cover, heater, etc.) with detergent and clear
water.