Installation
Installation of Sphere Boiler
1) Open the box, checking items according to the packing list. After removing all
packing items in the machines, place the machine at installation location in the
kitchen.
2) Unscrew the screws located in the rear left and right side of the machine for
future maintenance.
3) Level the Sphere with the Adjustable feet on all four machine legs to ensure the
installation is level. (Note: use four Locating Pins in the machine as a reference to
ensure if it is level after add the water.)
4) Connecting power supply
a) Power supply connections should be done by a licensed electrician. Power
supply wire use two-phase three wire (two phase line and one ground line). Basic
requirement:
b) Unscrew four screws on front panel (see Fig. 6), pull outwards (downwards) to
remove the panel.
c) Put the cable with plastic coated metal hose through the cable necking in the front
of the machine base. Leave enough length for moving machine, screw up cable
necking to fix cable. Fix the end of the plastic coated metal hose with waterproof
electrical tape.
6