#5 INSTALLING THE VENTILATION FOR 

THE CHILLER UNIT 

————————————————————
Ventilation will ensure your chiller 
performs to its speci

fi

cation. Failure to 

install this will void the warranty on this 
module. 

5.1  Inside the packing you will 

fi

nd    

 

cutting templates. Chose the CS20  

 

base and front grill.

5.2  Drop the kick board and check   
 

underneath the left side of the    

 

cupboard for any pipes or electrical  

 

wires that may be in the way. Ensure  

 

they are moved before starting to  

 

cut the ventilation.

5.3  locate base cutting template inside  
 

the left side of the cupboard, mark  

 

the 4 corners and cut the ventilation  

 

hole into the base.

5.4  install the vent kit steel angle piece  
 

provided and insert the vent duct so  

 

that it runs to the front of the  

 

 

cupboard. Mark off the point where  

 

it crosses the kickboard and cut to  

 

length using a suitable hand saw. 

5.5  Using the template for the kick board  
 

vent grill mark the location for the  

 

screws and cut out area and cut  

 

out.

5.6  Fix grill to front and replace the kick  
 

board so that it marries up with the  

 

vent duct.

————————————————————

————————————————————

#6 CONNECTING WATER SUPPLY

————————————————————

6.1  Connect the John Guest 1/2” - 1/4”  
 

reducer from the installation kit to the  

 

cold isolation valve 

6.2  Connect the blue ¼” tube found in  
 

the installation kit to this ¼”  

 

 

connection on the mains supply  

 

(push in 

fi

rmly) then cut it at a length  

 

that extends to the front of the    

 

cupboard where the Boiler inlet will  

 

sit. 

6.3  Attach the ¼” isolator valve from the  
 

fi

tting kit and add a 6” piece of blue  

 

pipe onto its outlet.

6.4  Now slide the QST553-B (the boiler)  
 

into place on the right side of the  

 

cupboard. Connect the ¼” pipe  

 

from the isolator into the front    

 

right-hand side port. 

6.5  Now turn on the mains water supply  
 

and open the isolator, check the  

 

connections are Water-tight.  

6.6  In your installation kit you will 

fi

nd a  

 

length of silicon hose with a  

 

 

VenturiT™ connector. Connect the  

 

shortest length (above the T) to either  

 

of the 2 pipes protruding from the  

 

base of the spout ensuing you have  

 

located the spring clip 

fi

rst. NOTE  

 

Only push the silicon upwards onto  

 

the pipe – do not pull the pipe down  

 

to join it or you’ll risk disconnecting it  

 

from the spout tip. 

6.7  Connect the other end to the rear  
 

spigot sticking up at the back of the  

 

boiler unit. Do this by cutting the  

 

length back so that you don’t have  

 

too much pipe in use. The run should  

 

be as log as necessary to make a  

I N S TA L L AT I O N

Summary of Contents for SmartTap

Page 1: ...BOILING CHILLED SPARKLING tT Collection INSTALLATION GUIDE...

Page 2: ...r 45psi Max recommended operating pressure 4Bar 60psi 1 2 Drainage Trapped upstand washing machine type Ideally located back left hand side of upboard so that it doesn t sterilise the floor space of t...

Page 3: ...E TYPICAL INSTALL QUATREAU SMARTTAP WITH DRIP TRAY Shown here with tap over adjacent cupboard for clarity When installing the tap will sit above the equipment Shown here with tap over adjacent cupboar...

Page 4: ...ntil ready to install 2 6 Open and inspect the chiller carbonator leave in its base until ready to install 3 INSTALLING THE QUATREAU SMARTTAP 3 1 NOTE THAT THE TAP MUST BE SITED ABOVE OR ADJACENT TO T...

Page 5: ...F THE QST553 B IT S ESSENTIAL THAT THE QST553 IS LOCATED CLOSE TO THIS CABLE WITHOUT CAUSING IT TO STRETCH 4 INSTALLING THE TYPE AA AIRGAP DRAIN This device prevents reverse contamination into the boi...

Page 6: ...t the John Guest 1 2 1 4 reducer from the installation kit to the cold isolation valve 6 2 Connect the blue tube found in the installation kit to this connection on the mains supply push in firmly the...

Page 7: ...60psi at all times You may need to add a pump to ensure the optimum psi is supplied to the Quatreau system During commissioning use only mains water then convert to RO once the system has been set up...

Page 8: ...4Bar 60psi CO2 CAPACITY CS20 20ltrs h at 4C NAME OF INSTALLING ENGINEER INSTALLATION DATE INSTALLATION NOTES Mains cold water pressure psi Flow rate from mains supply ltr min Hardness of mains cold wa...

Page 9: ...lution approx Refit the housing to the system and activate the water supply Run the water through the boiling chilled and sparkling function until you can smell chlorine in the water Isolate water run...