C O N T E N T S

————————————————————
INSTALLATION GUIDE 
————————————————————
CONTENTS

1. 

Pre-Installation check list

2. 

Unpacking and checking your 
equipment

3. 

Installing the SmartTap™

4. 

Installing the Type AA (airgap) drain off 
device

5. 

Cutting in the ventilation for the chiller 
unit

6. 

Installing the Mains water supply and 
the QST553-B (boiler)

7. 

Installing the CS20 (chiller carbonator)

———————————--------———————
#1 PRE-INSTALLATION CHECK LIST
———————————————————— 

1.1

 

Mains Cold Water 

 

An isolated 1/2” lever ball valve (ideally  

 

fi

xed to top front right hand side wall of  

 

cupboard, set back 6” from door, 20”  

 

up from base). 

 

Min recommended operating pressure  

 

3Bar / 45psi

 

Max recommended operating    

 

pressure 4Bar / 60psi

1.2  Drainage
 

Trapped upstand (washing machine  

 

type) (Ideally located back left hand  

 

side of upboard so that it doesn’t   

 

sterilise the 

fl

oor space of the  

 

 

cupboard) 

1.3  Power
 

The system requires 2 x 15amp sockets  

 

or one double socket (ideally 

fi

xed  

 

front left hand side of cupboard, set  

 

back 6” from door, 20” up from base). 

1.4  Tools required
 

Jigsaw to cut ventilation into the    

 

cupboard base.

 

Drill and bits suited to the worksurface

a.  SmartTap™ 1 x 30mm core bit (or   
 

closest match)

b.  SmartTap™ with Drainer  1 x 150mm  
 

core bit (or closest match)

1.5  John Guest Fittings 
 

Refer to https://www.johnguest.com/ 

 

speed

fi

t/product/cts-jg-twist-lock-   

 

fi

ttings/end-cap/

————————————————————
SANITATION AND FILTER
————————————————————

Sanitation and Filter Change
Procedure

1.

Summary of Contents for SmartTap

Page 1: ...BOILING CHILLED SPARKLING tT Collection INSTALLATION GUIDE...

Page 2: ...r 45psi Max recommended operating pressure 4Bar 60psi 1 2 Drainage Trapped upstand washing machine type Ideally located back left hand side of upboard so that it doesn t sterilise the floor space of t...

Page 3: ...E TYPICAL INSTALL QUATREAU SMARTTAP WITH DRIP TRAY Shown here with tap over adjacent cupboard for clarity When installing the tap will sit above the equipment Shown here with tap over adjacent cupboar...

Page 4: ...ntil ready to install 2 6 Open and inspect the chiller carbonator leave in its base until ready to install 3 INSTALLING THE QUATREAU SMARTTAP 3 1 NOTE THAT THE TAP MUST BE SITED ABOVE OR ADJACENT TO T...

Page 5: ...F THE QST553 B IT S ESSENTIAL THAT THE QST553 IS LOCATED CLOSE TO THIS CABLE WITHOUT CAUSING IT TO STRETCH 4 INSTALLING THE TYPE AA AIRGAP DRAIN This device prevents reverse contamination into the boi...

Page 6: ...t the John Guest 1 2 1 4 reducer from the installation kit to the cold isolation valve 6 2 Connect the blue tube found in the installation kit to this connection on the mains supply push in firmly the...

Page 7: ...60psi at all times You may need to add a pump to ensure the optimum psi is supplied to the Quatreau system During commissioning use only mains water then convert to RO once the system has been set up...

Page 8: ...4Bar 60psi CO2 CAPACITY CS20 20ltrs h at 4C NAME OF INSTALLING ENGINEER INSTALLATION DATE INSTALLATION NOTES Mains cold water pressure psi Flow rate from mains supply ltr min Hardness of mains cold wa...

Page 9: ...lution approx Refit the housing to the system and activate the water supply Run the water through the boiling chilled and sparkling function until you can smell chlorine in the water Isolate water run...

Reviews: