1 9
e n
W
ARR
AN
TY
, SAF
ET
Y AN
D
IN
ST
AL
LA
TIO
N
E X PL A N ATORY V IDEO
This QR code takes you to video about
setting up the fryer.
Immediately lift the fryer unit onto the work surface where it will be
installed. This should be done by two (2) people, so that the base of
the machine is exposed, allowing it to be worked on easily.
Once the fryer unit is on the work surface, insert the fryer, and lower
the extractor dock over the case so that fumes do not escape while
frying.
Connect the iQ 640 FES CARROUSEL machine to a single phase 20
Amp plug so that you can turn it on and insert 5.5 litres of oil.
You can also see this whole procedure in the following video by
scanning the following QR code “Unpacking and setting-up the
machine”.
Summary of Contents for iQ 640
Page 4: ...4 Q U A L I T Y F R Y iQ 640 FES CARROUSEL IMAGE See de iQ 640 FES CARROUSEL OPEN...
Page 6: ...G e n e r a l i n d e x...
Page 8: ...8 Q U A L I T Y F R Y IMPORTANT GENERAL INFORMATION...
Page 51: ...5 1 e n 1 2 3 4 Description of the equipment...
Page 53: ...5 3 e n 1 3 2 Description of the equipment...
Page 55: ...5 5 e n 2 7 1 Description of the equipment 3 4 5 6...
Page 69: ...6 9 e n Product outputs...
Page 100: ...W W W q u a l i t y f r y c o m M A S A T 0 7 R e v 0 2...
Page 101: ......