XCubeFAS 3126
Hardware Manual
Installing the System Hardware
© 2021 QSAN Technology, Inc. All rights reserved.
www.qsan.com
Official
Document
30
TIP
Install the disk drive trays into the system after the system chassis is
mounted in the rack. Doing this can reduce the loading of the overall weight
when you mount the system chassis in the rack.
Installing the Slide Rails
1.
Take the slide rails from the carton. Pull the inner rail out and slide the intermediate rail
back.
Figure 3-5 First Step of the Slide Rails Installation
2.
Install the inner rail onto the chassis.