QSR series
5 - Installation
• Cut the hull along the cutting area previously marked
(fig. 4).
• Align the counter flange to the hull’s opening and check that the four heights are correct (fig.1B). Resinate the counter flange,
or solder it in case of aluminium or steel, according to the techniques the most suitable to the hull’s material (fig. 5).
Fig. 4
LID
HULL
Fig. 6
COUNTER FLANGE
• Make a solid coaming for the closing lid on the whole perimeter of the hull’s opening (fig. 6).
Fig. 5
Laminating system
recommended by QS Seamaster
®
.
F
HULL
COUNTER FLANGE
STRUCTURAL ADHESIVE
GRP LAYERS
GRP LAYERS
GRP LAYERS
GRP LAYERS