background image

20

21

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G10.2 / G10.c – Q CELLS

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G10.2 / G10.c – Q CELLS

20

5  GROUNDING

Protective Grounding

In order to prevent electrical shock or fire, the frame of the module 
as well as any non-current-carrying metal parts of the system must 
be grounded. While this section provides some information about 
grounding the Q CELLS frames and modules, reference should be 
made to local statutes and regulations for specific requirements 
on grounding. The U.S. National Electrical Code addresses these 
issues in Article 250. A module with exposed conductive parts is 
considered to be in compliance with this standard only when it is 
either electrically grounded in accordance with the manufacturer’s 
instructions and the requirements of the National Electrical Code, 
ANSI/NFPA 70 (2014-2017), or when the bonding means has been 
evaluated with this module to UL 2703.

Proper grounding is achieved by bonding all exposed non-current-
carrying metal equipment to the appropriately sized equipment 
grounding conductor (EGC) or racking system that can be used 
for integrated grounding.

Q CELLS frames are protected from corrosion with an anodized 
coating, which has to be penetrated in order to ensure proper 
bonding. The different methods listed below are suggested methods 
for an appropriate bond between the frame and the EGC or racking 
system (that will have to be properly grounded). The method appro-
priate for any individual installation will depend on multiple factors.

Option A: Use of a grounding lug

A listed grounding lug can be bonded to the frame using the grounding 
holes pre-drilled in the frame. These holes are marked with a ground 
symbol, as shown below on the frame section drawing: To install the 
grounding lug, follow the specified instructions of the manufacturer. 
The grounding lug should be made of stainless steel or tin plated 
metals such as aluminum to avoid corrosion.

The grounding lug should be attached to the frame grounding hole 
using a stainless steel screw, toothed lock washer or KEPS nut (in 
order to penetrate the anodized layer) and backing nut. Care should 
be taken to avoid the use of grounding hardware of dissimilar metals, 
which may lead to corrosion.

Option B: Integrated grounding methods

The Q CELLS modules can be bonded with the racking system 
using UL1703 or UL2703 certified integrated grounding methods. 
The racking system will then have to be grounded so that the overall 
system is properly grounded. The listed racking system and grounding 
device should be installed in accordance with the manufacturers’ 
instructions. An example of such integrated grounding method is 
the use of a WEEB clip or Schletter plate between the module and 
the racking system, when mounting the module.

The WEEB washers are generally compatible with Q CELLS modules, 
however each combination module / racking system requires a specific 
WEEB washer size. Note that WEEB clips are intended for single use 
only; they must not be reused after removal or loosening. Refer to 
Wiley’s installation instructions for the specific use of WEEB washers.

An example of such integrated grounding method is the use of a 
washer recognized as meeting UL2703 requirements between the 
module and the racking system, when mounting the module. For 
example, WEEB washers are generally compatible with Q CELLS 
modules, however each combination module / racking system 
requires a specific WEEB washer size. Note that WEEB washers are 
intended for single use only; they must not be reused after removal 
or loosening. Refer to Wiley’s installation instructions for the specific 
use of WEEB washers.

• 

Dimensions shown are in inches.

0.177” (+0.008/-0)

±0.08

0.79”

0.47”

±

0.08

PV Laminate

Backing Nut (Stainless Steel)

Toothed Lock Washer (Stainless 
Steel)

Grounding Lug (Stainless Steel 
or tin-plated metal)

Equipment 
Grounding 
Conductor

Aluminum 
Frame

Screw (Stainless Steel)

 

Ä

Ensure that all necessary safety and functional 
tests have been carried out according to 
applicable standards.

NOTE! Module damage may occur!

 

Ä

Ensure that the plug connections are secured away 
from any water-channelling surface. 

 

Ä

Integrate the system into the existing lightening 
protection system in accordance with the 
applicable local regulations.

WARNING! Fire Risk!

 

Ä

Do not use light concentrators (e.g. mirrors or 
lenses).

 

Ä

Ensure that the cabling is not exposed and / or 
hanging and is protected from dirt, moisture and 
mechanical friction.

4  ELECTRICAL CONNECTION

4.4 AFTER INSTALLATION

Summary of Contents for Q.PEAK DUO XL-G10.c

Page 1: ...Valid for North America INSTALLATION AND OPERATION MANUAL Q PEAK DUO XL G10 2 G10 c solar module series...

Page 2: ...are responsible for com pliance with all applicable statutory requirements and regulations The following regulations and standards must be upheld at all times during the installation operation and mai...

Page 3: ...ble documents This installation manual is only valid in combination with the following technical information DOCUMENT TYPE Product data sheet Packaging and transport information MISUSE OR INCORRECT US...

Page 4: ...tress free expansion and contraction due to tem perature fluctuations Ensurethatnoadditionalforcesareappliedthroughthemounting system into the module except for the wind and snow loads Additional forc...

Page 5: ...YSTEM INSTALLATION ON MOUNTING POINTS INSTALLATION WITH INSERTION PROFILES NOT PERMITTED TRACKER INSTALLATION ON MOUNTING POINTS TB1a 35 8 908 TB2a 35 8 908 35 8 28 1 17 9 908 713 454 TB1b 28 1 713 TB...

Page 6: ...the module TC1 Ensure minimum support depth of 12mm on the backside and 10mm on the front side of the module FB1 FB2 TB1a TB2a TB1b TB2b mFB2 Use M8 corrosion proof screws and washers diameter 15 8mm...

Page 7: ...ng factor of 125 percent 80 percent derating which might be applicable Please follow the valid national guidelines for the installation of electrical systems refer to section 690 8 of the NEC for an a...

Page 8: ...out the installation alone Only install undamaged modules and components Do not modify the module e g do not drill any additional holes 3 INSTALLATION 3 2 PREPARATION OF INSTALLATION confirmation let...

Page 9: ...Ensure that the modules are disconnected at the inverter prior to separation Be sure to observe the time intervals specified by the inverter manufacturer after switching off the inverter Make sure th...

Page 10: ...ick click DANGER Risk of fatal injury due to electric shock Ensure that all electrical components are in a proper dry and safe condition SOLAR 4 ELECTRICAL CONNECTION 4 3 CONNECTION OF MODULES DANGER...

Page 11: ...and backing nut Care should be taken to avoid the use of grounding hardware of dissimilar metals which may lead to corrosion Option B Integrated grounding methods The Q CELLS modules can be bonded wi...

Page 12: ...ing to the state of the art and taking into account all relevant safety issues and general product properties e g but not restricted to electrical safety mechanical stability load limits depending on...

Page 13: ...ithout notice Q CELLS Installation manual solar modules Q PEAK DUO XL G10 2_G10 c_2022 01_Rev02_NA 24 INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q PEAK DUO XL G10 2 G10 c Q CELLS Free the substru...

Reviews: