INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G10.2 / G10.c – Q CELLS

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G10.2 / G10.c – Q CELLS

13

3  INSTALLATION

3.1  SAFETY AND TRANSPORT

 

Ä

Leave modules in their original packaging until 
installation.

 

Ä

Store the modules securely in cool and dry rooms. 
The packaging is not weatherproof.

 

Ä

Inspect the packaging for damages.

 

Ä

Contact the transport company regarding 
any damage to the packaging and follow their 
instructions.

 

Ä

Follow any instructions on the packaging.

 

Ä

Ensure that all personnel are aware of and adhere 
to accident-prevention and safety regulations.

 

Ä

While working wear clean gloves.

§

GB

§

I

§

D

DANGER! Risk of fatal injury due to electric shock!

 

Ä

Do not install damaged modules.

 

Ä

Inform your vendor of any damages 
immediately.

WARNING! Fire Risk!

 

Ä

Do not install modules indoors.

 

Ä

Do not install modules on moving objects.

Module Selection

For detailed key electrical data, please refer to the product data 
sheet for the respective product. (available at www.q-cells.us).

 

Ä

For maximum energy yields, mismatches of specified electric 
current (I

MPP

) of more than 5 % should be avoided for all modules 

connected in series.

Safety Factor

During normal operation, a module may generate a greater current 
and / or higher voltage than that determined under standardized test 
conditions. Accordingly, the values of I

SC

 and V

OC

 marked on the 

module should be multiplied by a facot of 1.25 when determining:

• 

the component voltage ratings,

• 

conductor ampacities,

• 

fuse sizes,

• 

size of controls connected to the PV output.

Refer to Section 690-8 of the National Electrical Code for an 
additional multiplying factor of 125 percent (80 percent derating) 
which might be applicable.

 

Ä

Please follow the valid national guidelines for the installation 
of electrical systems (refer to section 690-8 of the NEC for an 
additional multiplying factor of 125 percent [80 percent derating] 
which may be applicable).

Series Connection

Connection of modules in series is only permitted up to the maximum 
system voltage as listed in the applicable data sheet.

 

Ä

Take into account all possible operating situations and all relevant 
technical norms and regulations when designing the system. 
This will ensure that the maximum system voltage, including all 
necessary safety margins, is not exceeded.

 

Ä

Take the voltage limit of the inverter into account when deter-
mining the maximum number of modules in the string.

Parallel Connection

Modules may be damaged by the occurrence of reverse currents 
(caused by module defects, ground leaks, or defective insulation).

 

Ä

Ensure that the maximum reverse current load capacity indicated 
in the data sheet is met.

In order to limit reverse currents that may occur, we recommend 
using the following safety options:

1) 

Layout with a limited number of 
parallel connected strings :

Without undertaking further current blocking measures, a maximum 
of two module strings may be operated in parallel on a single 
inverter or MPP tracker.

2) 

Layout with string fuses :

Use overcurrent devices (e.g. fuses) according to the relevant 
standards in each string. Use gPV-fuses according to IEC 60269-6. 
Observe the maximum permitted number of strings as indicated 
in the specifications provided by the respective string fuse manu-
facturer and the technical guidelines.

NOTE!

When installing different product versions, the lowest minimum 
permitted reverse current load capacity applies. 

Inverters

Inverters with or without transformers may be used.

2  PLANNING

2.4 ELECTRICAL LAYOUT

Summary of Contents for Q.PEAK DUO XL-G10.c

Page 1: ...Valid for North America INSTALLATION AND OPERATION MANUAL Q PEAK DUO XL G10 2 G10 c solar module series...

Page 2: ...are responsible for com pliance with all applicable statutory requirements and regulations The following regulations and standards must be upheld at all times during the installation operation and mai...

Page 3: ...ble documents This installation manual is only valid in combination with the following technical information DOCUMENT TYPE Product data sheet Packaging and transport information MISUSE OR INCORRECT US...

Page 4: ...tress free expansion and contraction due to tem perature fluctuations Ensurethatnoadditionalforcesareappliedthroughthemounting system into the module except for the wind and snow loads Additional forc...

Page 5: ...YSTEM INSTALLATION ON MOUNTING POINTS INSTALLATION WITH INSERTION PROFILES NOT PERMITTED TRACKER INSTALLATION ON MOUNTING POINTS TB1a 35 8 908 TB2a 35 8 908 35 8 28 1 17 9 908 713 454 TB1b 28 1 713 TB...

Page 6: ...the module TC1 Ensure minimum support depth of 12mm on the backside and 10mm on the front side of the module FB1 FB2 TB1a TB2a TB1b TB2b mFB2 Use M8 corrosion proof screws and washers diameter 15 8mm...

Page 7: ...ng factor of 125 percent 80 percent derating which might be applicable Please follow the valid national guidelines for the installation of electrical systems refer to section 690 8 of the NEC for an a...

Page 8: ...out the installation alone Only install undamaged modules and components Do not modify the module e g do not drill any additional holes 3 INSTALLATION 3 2 PREPARATION OF INSTALLATION confirmation let...

Page 9: ...Ensure that the modules are disconnected at the inverter prior to separation Be sure to observe the time intervals specified by the inverter manufacturer after switching off the inverter Make sure th...

Page 10: ...ick click DANGER Risk of fatal injury due to electric shock Ensure that all electrical components are in a proper dry and safe condition SOLAR 4 ELECTRICAL CONNECTION 4 3 CONNECTION OF MODULES DANGER...

Page 11: ...and backing nut Care should be taken to avoid the use of grounding hardware of dissimilar metals which may lead to corrosion Option B Integrated grounding methods The Q CELLS modules can be bonded wi...

Page 12: ...ing to the state of the art and taking into account all relevant safety issues and general product properties e g but not restricted to electrical safety mechanical stability load limits depending on...

Page 13: ...ithout notice Q CELLS Installation manual solar modules Q PEAK DUO XL G10 2_G10 c_2022 01_Rev02_NA 24 INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q PEAK DUO XL G10 2 G10 c Q CELLS Free the substru...

Reviews: